The purpose of the rule development is to implement the provision of HB 827 (Chapter 2019-86, L.O.F.), and to make any additional changes or revisions required by the legislation.
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
Board of Professional Engineers
RULE NOS.:RULE TITLES:
61G15-31.001General Responsibility
61G15-31.002Definitions
61G15-31.003Design of Structures Utilizing Prefabricated Wood Trusses
61G15-31.004Design of Cast-in-Place Post-Tensioned Concrete Structural Systems
61G15-31.005Design of Structures Utilizing Precast and Prestressed Concrete Components
61G15-31.006Design of Structural Systems Utilizing Open Web Steel Joists and Joist Girders
61G15-31.007Design of Metal Building Systems
61G15-31.008Design of Foundations
61G15-31.009Design of Structural Steel Systems
PURPOSE AND EFFECT: The purpose of the rule development is to implement the provision of HB 827 (Chapter 2019-86, L.O.F.), and to make any additional changes or revisions required by the legislation.
SUBJECT AREA TO BE ADDRESSED: Rule text.
RULEMAKING AUTHORITY: 471.033(2), 471.008 FS.
LAW IMPLEMENTED: 471.033(1)(g), (j) FS.
IF REQUESTED IN WRITING AND NOT DEEMED UNNECESSARY BY THE AGENCY HEAD, A RULE DEVELOPMENT WORKSHOP WILL BE NOTICED IN THE NEXT AVAILABLE FLORIDA ADMINISTRATIVE REGISTER.
THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE DEVELOPMENT AND A COPY OF THE PRELIMINARY DRAFT, IF AVAILABLE, IS: Zana Raybon, Executive Director, Board of Professional Engineers, 2639 North Monroe Street, Suite B-112, Tallahassee, FL 32303; (850)521-0500.
THE PRELIMINARY TEXT OF THE PROPOSED RULE DEVELOPMENT IS NOT AVAILABLE.
Document Information
- Subject:
- Rule text.
- Purpose:
- The purpose of the rule development is to implement the provision of HB 827 (Chapter 2019-86, L.O.F.), and to make any additional changes or revisions required by the legislation.
- Rulemaking Authority:
- 471.033(2), 471.008 FS.
- Law:
- 471.033(1)(g), (j) FS.
- Contact:
- Zana Raybon, Executive Director, Board of Professional Engineers, 2639 North Monroe Street, Suite B-112, Tallahassee, FL 32303; 850-521-0500.
- Related Rules: (9)
- 61G15-31.001. General Responsibility
- 61G15-31.002. Definitions
- 61G15-31.003. Design of Structures Utilizing Prefabricated Wood Trusses
- 61G15-31.004. Design of Cast-in-Place Post-Tensioned Concrete Structural Systems
- 61G15-31.005. Design of Structures Utilizing Precast and Prestressed Concrete Components
- More ...