40D-3.101: Content of Application
40D-3.411: Well Completion Report
PURPOSE AND EFFECT: The purpose of this rulemaking is to adopt and incorporate by reference a revised State of Florida Permit Application to Construct, Repair, Modify or Abandon a Well, to be numbered as District Form No. LEG-R.040.01 (6/10) and a revised Well Completion Report, to be numbered as District Form No. LEG-R.005.02 (6/10). The effect will be to make the District-adopted forms identical to revised forms proposed for statewide use by the Department of Environmental Protection.
SUMMARY: The proposed rulemaking is to adopt standardized forms for well construction permit applications and well completion reports which are submitted to document the well construction work. The District-adopted forms are the same as forms used by all water management districts and delegated agencies for the administration of well construction permitting and were initially designed by the Florida Department of Environmental Protection (DEP) as statewide forms adoptable by each district. DEP has prepared new forms for use by the water management districts in administering the well construction permitting program. DEP anticipates adopting these forms for statewide use.
SUMMARY OF STATEMENT OF ESTIMATED REGULATORY COSTS: No Statement of Estimated Regulatory Cost was prepared.
Any person who wishes to provide information regarding a statement of estimated regulatory costs, or provide a proposal for a lower cost regulatory alternative must do so in writing within 21 days of this notice.
SPECIFIC AUTHORITY: 373.044, 373.113, 373.171, 373.309, 373.337 FS.
LAW IMPLEMENTED: 373.109, 373.308, 373.309, 373.313, 373.316 FS.
IF REQUESTED WITHIN 21 DAYS OF THE DATE OF THIS NOTICE, A HEARING WILL BE SCHEDULED AND ANNOUNCED IN FAW.
Pursuant to the provisions of the Americans with Disabilities Act, any person requiring special accommodations to participate in this workshop/meeting is asked to advise the agency at least 5 days before the workshop/meeting by contacting: The Southwest Florida Water Management District, Human Resources Director, 2379 Broad Street, Brooksville, Florida 34604-6899; telephone (352)796-7211, ext. 4702 or 1(800)423-1476 (FL only), ext. 4702; TDD (FL only) 1(800)231-6103; or email to ADACoordinator@swfwmd.state.fl.us. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).
THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE IS: Dianne Lee, Office of General Counsel, 2379 Broad St., Brooksville, FL 34604-6899, (352)796-7211, ext 4657
THE FULL TEXT OF THE PROPOSED RULE IS:
40D-3.101 Content of Application.
(1) Applications for permits required by this chapter shall be submitted to the District. All permit applicants shall submit the form entitled State of Florida Permit Application to Construct, Repair, Modify or Abandon a Well, Form No. LEG-R.040.010 (6/10 4/09), incorporated herein by reference. Except for replacement and domestic use wells, all applications to construct a well within the Most Impacted Area of the Southern Water Use Caution Area, as set forth in subparagraph 40D-2.801(3)(b)2., and Figure 2.1, F.A.C., shall include the form entitled Well Verification for all Non-Domestic Use Wells Located in the Most Impacted Area of the Southern Water Use Caution Area, Form No. LEG-R.016.01 (4/09), incorporated herein by reference. Copies of all forms incorporated in this rule can be obtained from the Districts website at www.watermatters.org or from the District offices.
(2) No change.
(3) No change.
Rulemaking Authority 373.044, 373.113, 373.171, 373.309, 373.337 FS. Law Implemented 373.109, 373.308, 373.309, 373.313, 373.316 FS. HistoryReadopted 10-5-74, Formerly 16J-3.07, Amended 7-1-90, 9-30-91, 12-31-92, 4-11-94, 10-19-95, 2-26-07, 8-19-08, 8-30-09,________.
40D-3.411 Well Completion Report.
(1) Well completion reports are required for the construction, repair, modification or abandonment of all wells. The Districts receipt of a well completion report raises the rebuttable presumption that all work under the permit has been completed or has ceased.
(a) The water well contractor or any individual permittee shall submit to the District the form entitled Well Completion Report, Form No. LEG-R.005.021 (6/10 4/09), incorporated herein by reference, within 30 days of the expiration of the permit. Copies of the Well Completion Report form can be obtained from the Districts website at www.watermatters.org or from District offices.
(b) If no work is performed or if the well is not completed, a completion report shall be filed within 30 days of the expiration of the permit stating that no well construction was performed or completed under the permit.
(c) The District shall require a record of the well construction at any time prior to the submittal of the completion report if any drilling problems are encountered during well construction. The District may request a record either orally or in writing. The water well contractor or individual permittee shall provide the record within 7 seven days of receipt of the Districts request.
(d) The record of the well construction shall include the depth of the well, the depth of the well casing, the amount of grout material used, and a description of the geologic material and any drilling problems encountered during the well construction.
(2) No change.
Rulemaking Authority 373.044, 373.113, 373.171, 373.309, 373.337 FS. Law Implemented 373.308, 373.309, 373.313 FS. History Readopted 10-5-74, Amended 10-24-76, Formerly 16J-3.09, 16J-3.14, Amended 7-1-90, 9-30-91, 12-31-92, 10-19-95, 1-1-01, 2-26-07, 8-19-08, 8-30-09,___________.