This is a technical meeting to discuss water quality improvement projects and allocation of nutrient load reductions that are part of the North Indian River Lagoon Basin Management Action Plan. The revised draft of the Basin Management Action Plan ...
DEPARTMENT OF ENVIRONMENTAL PROTECTION
The Department of Environmental Protection announces a public meeting to which all persons are invited.
DATE AND TIME: August 2, 2012, 9:30 a.m.
PLACE: Brevard County Agricultural Center, 3695 Lake Drive, Cocoa, Florida 32926
GENERAL SUBJECT MATTER TO BE CONSIDERED: This is a technical meeting to discuss water quality improvement projects and allocation of nutrient load reductions that are part of the North Indian River Lagoon Basin Management Action Plan. The revised draft of the Basin Management Action Plan will be presented at this meeting. The Total Maximum Daily Load for the North Indian River Lagoon was adopted in March 2009, and requires reductions in the loadings of total nitrogen and total phosphorus sufficient to meet seagrass depth limit targets.
A copy of the agenda may be obtained by contacting: Ms. Mary Paulic, Department of Environmental Protection, 2600 Blair Stone Road, MS #3565, Tallahassee, Florida 32399-2400 or by calling her at (850)245-8560.
Pursuant to the provisions of the Americans with Disabilities Act, any person requiring special accommodations to participate in this workshop/meeting is asked to advise the agency at least 48 hours before the workshop/meeting by contacting: Ms. Mary Paulic, (850)245-8560. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).
Document Information
- Hearing Meeting:
- Brevard County Agricultural Center, 3695 Lake Drive, Cocoa, Florida 32926
- Subject:
- This is a technical meeting to discuss water quality improvement projects and allocation of nutrient load reductions that are part of the North Indian River Lagoon Basin Management Action Plan. The revised draft of the Basin Management Action Plan will be presented at this meeting. The Total Maximum Daily Load for the North Indian River Lagoon was adopted in March 2009and requires reductions in the loadings of total nitrogen and total phosphorus sufficient to meet seagrass depth limit targets.
- Meeting:
- public meeting
- Contact:
- Ms. Mary Paulic, Department of Environmental Protection, 2600 Blair Stone Road, MS #3565, Tallahassee, Florida 32399-2400 or by calling her at (850)245-8560