Department of Education, University of Florida  

  •  

    DEPARTMENT OF EDUCATION

    University of Florida

    Commissioning Consultant Services

    NOTICE TO PROFESSIONAL CONSULTANTS:

    The University of Florida Board of Trustees announces that Professional Services in the disciplines of engineering and architecture for Total Building Commissioning will be required for the project listed below:

    Project: UF-591, UF Health, “OOO” Building, West of Main Campus, Gainesville, Florida

    The UF Health Otolaryngology, Ophthalmology and Orthopaedics building (“OOO”) is projected as a 4 story, approximately 100,000 (final size TBD during the ASD) gross square foot state of the art multidisciplinary facility engaged in the teaching, research, surgery, rehabilitation and clinical care of all patients with conditions affecting their eyes, ears, nose, throat, and musculoskeletal system.

    The estimated construction budget is approximately $28M. The project will be delivered using the Construction Manager At-Risk method. Design and construction will be fast tracked. Occupancy is July 2018. GOLD LEED (Leadership in Energy and Environmental Design) certification (V4) by the U.S. Green Building Council is mandatory, however, platinum is desired.

    The contract for Commissioning services will consist of several phases, pre-construction, construction and post occupancy. The services will begin prior to completion of the schematic design and will include complete peer review of the design, systems and envelope constructability reviews, maintenance of the Owner’s Project Requirement (OPR), development of the commissioning plan, and construction phase pre-functional, functional, and performance testing for mechanical, electrical, building automation and building envelope systems.

    Blanket professional liability insurance will be required for this project in the amount of $1,000,000. The selected applicant will also be required to provide insurance coverage for General Liability, Automotive Liability, and Worker’s Compensation.

    INSTRUCTIONS:

    Firms desiring to apply for consideration shall submit a proposal only after thoroughly reviewing the facilities program, Project Fact Sheet for Commissioning Consultants, and other background information. The proposal shall be limited to 20 single-sided pages OR 10 double-sided, consecutively-numbered pages and shall include:

    1.A Letter of Application that concisely illustrates the applicant’s understanding of the scope of services.

    2.A completed, project-specific Commissioning proposal form with signed certification. Applications on any other form will not be considered.

    3.Resumes, LEED accreditation, and other pertinent credentials for all proposed staff (applicant and consultants).

    4.Proof of the applicant’s corporate status in Florida (if applicable) and copies of current licenses for the applicant firm and its consultants (firms) from the appropriate governing board.

    5.Proof of the applicant’s ability to be insured for the level of professional liability coverage demanded for this project.

    At the time of application, the applicant must possess current design Professional Registration Certificate(s) from the appropriate governing board; must be properly registered to practice its profession in the State of Florida; and, if the applicant is a corporation, must be chartered by the Florida Department of State to operate in Florida. As required by Section 287.133, Florida Statutes, an applicant may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected applicant must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.

    Incomplete proposals will be disqualified. Submittal materials will not be returned.

    The Commissioning Services Proposal Form and Instructions, Project Fact Sheet, UF Design Services Guide, UF Design & Construction Standards, PD&C non-technical specifications, standard University of Florida Owner-Commissioning Consultant agreement, and other project and process information can be found on the Planning Design & Construction website. Finalists may be provided with supplemental interview requirements and criteria as needed.

    Provide the electronic copy of the proposals as prescribed in the Project Fact Sheet. Submittals must be received in the Planning Design & Construction office by 3:00 PM local time, on Friday, August 26, 2016. Facsimile (FAX) submittals are not acceptable and will not be considered.

    Planning Design & Construction

    245 Gale Lemerand Drive / P.O. Box 115050

    Gainesville, FL 32611-5050

    Telephone: (352)273-4000

    Internet: www.facilities.ufl.edu

Document Information