Definitions, Formal Determinations, Exemptions, Publications and Agreements Incorporated by Reference, Content and Processing of the Application, Amended 12-3-98, Conditions for Issuance of Permits, Additional Conditions for Issuance of Permits, ...  

  •  

    WATER MANAGEMENT DISTRICTS

    Suwannee River Water Management District

    RULE NOS.:RULE TITLES:

    40B-400.021Definitions

    40B-400.046Formal Determinations

    40B-400.051Exemptions
    40B-400.091Publications and Agreements Incorporated by Reference

    40B-400.101Content and Processing of the Application, Amended 12-3-98

    40B-400.103Conditions for Issuance of Permits

    40B-400.104Additional Conditions for Issuance of Permits

    40B-400.115 Limiting Conditions

    40B-400.201Policy and Purpose

    40B-400.211Processing Procedures for Noticed General Permits

    40B-400.215General Conditions for All Noticed General Permits

    40B-400.417General Permit for Construction, Alteration or Maintenance of Boat Ramps and Associated Accessory Docks

    40B-400.427General Permit for Certain Piers and Associated Structures

    40B-400.431General Permit for Installation of Riprap

    40B-400.437General Permit for the Installation of Fences

    40B-400.439General Permit for the Construction or Maintenance of Culverted Driveways, Road Crossings and Bridges of Artificial Waterways

    40B-400.443General Permit to the Florida Department of Transportation, Counties and Municipalities for Minor Bridge Alteration, Replacement, Maintenance and Operation

    40B-400.447General Permit to the Florida Department of Transportation, Counties and Municipalities for Minor Activities Within Existing Rights-of-Way or Easements

    40B-400.453General Permit for Installation, Maintenance, Repair and Removal of Underground Cable, Conduit, or Pipeline

    40B-400.455General Permit for the Construction of Aerial Pipeline, Cable, and Conduit Crossings of Certain Waters

    40B-400.457General Permit for Subaqueous Utility Crossing of Artificial Waterways

    40B-400.463General Permit for the Construction and Operation of Culverts and Associated Water Control Structures in Mosquito Control Impoundments by Governmental Mosquito Control Agencies

    40B-400.467General Permit for Breaching Mosquito Control Impoundments by Governmental Mosquito Control Agencies

    40B-400.475General Permit for Minor Activities

    40B-400.483General Permit to the Department to Conduct Minor Activities

    40B-400.485General Permit to the Department for Environmental Restoration or Enhancement

    40B-400.487General Permit to the Department to Change Operating Schedules for Department Water Control Structures

    40B-400.495General Permit to U.S. Forest Service for Minor Works within National Forests

    40B-400.500General Permit After Notice for Construction, Operation, Maintenance, Alteration, Abandonment or Removal of Minor Silvicultural Surface Water Management Systems

    NOTICE OF CORRECTION

    Notice is hereby given that the following correction has been made to the proposed rule in Vol. 39, No. 49, March 12, 2013 issue of the Florida Administrative Register.

    SUMMARY OF STATEMENT OF ESTIMATED REGULATORY COSTS AND LEGISLATIVE RATIFICATION:

    The Agency has determined that this will not have an adverse impact on small business or likely increase directly or indirectly regulatory costs in excess of $200,000 in the aggregate within one year after the implementation of the rule. A SERC has not been prepared by the agency.

    The Agency has determined that the proposed rule is not expected to require legislative ratification based on the statement of estimated regulatory costs or if no SERC is required, the information expressly relied upon and described herein: Due to the fact that all rules are being moved to Chapter 62-330, F.A.C. with little to no change.