The
PROJECT NO.: TBD
PROJECT AND LOCATION: Science and Technology/General Academic Facility,
PROJECT DESCRIPTION: The proposed project is a multi-functional, multi-use facility, which may include research and instructional labs, faculty offices, computer classrooms, general academic and study rooms, and joint use areas to serve large groups for both academic and conference functions. This facility is anticipated to be a two-story structure of about 40,000 G.S.F. The estimated construction cost is $9,000,000.00.
The University is seeking to hire a Construction Manager with extensive construction experience in laboratory and academic facilities. The contract for Construction Management services shall consist of a pre-construction services phase and a construction phase. The pre-construction services phase, for which the Construction Manager will be paid a fixed fee, will include value engineering, constructability analyses, development of cost models, estimating, and the development of a Guaranteed Maximum Price (GMP) at 75% Construction Document phase. If the GMP is accepted, the Construction Phase will be implemented. Early bid packages for fast track and multi-phase development may be required to meet project goals.
Selection of finalists for interviews will be made on the basis of Construction Manager qualifications, including applicants experience, applicants personnel, applicants ability to provide service (record-keeping/administrative ability, recording of as-built conditions, critical path scheduling expertise, conceptual cost estimating and cost control ability, quality control capability, etc.), and the applicants license, bondability, and insurability. As part of the
INSTRUCTIONS: Firms desiring to provide Construction Management services for the project shall submit a letter of interest and a completed USFSP Construction Manager Qualifications Supplement dated February, 2007 with attachments and additional information required. Proposals must not exceed 60 pages, including the Construction Manager Qualifications Supplement and letter of interest, attachments and additional information. Pages must be numbered consecutively. Submittals that do not comply with these requirements or do not include the requested data may not be considered. Submittals are part of the public record and no submittal material will be returned.
All applicants must be licensed to practice as general contractors in the State of
The USFSP Construction Manager Qualifications Supplement form and the Project Fact Sheet may be obtained by contacting: Yoli Lanuza, Facilities Planning and Construction Services,
Interested firms are invited to attend a Pre-submittal Meeting at the
It shall be noted that no verbal communication shall take place between the applicants and the
One (1) original and five (5) bound copies of the above required proposal data shall be submitted to: James A. Grant, Director, Facilities Planning and Construction Services, University of South Florida St. Petersburg, 140 Seventh Avenue South, TER 100, St. Petersburg, Florida 33701.
Submittals must be received at the above campus address by 2:00 p.m. (EDT), on Friday, September 21, 2007. Facsimile (FAX) or electronic submittals are not acceptable and will not be considered. The University reserves the right to suspend or discontinue the selection process at any time and to return or reject any or all submissions of Construction Manager proposals without obligation to the respondent. The award of this contract is subject to availability of funds. If additional funding is realized, the University has the option to incorporate additional scope/funding under this contract.