NOTICE TO CONSTRUCTION MANAGERS
The
Project No. UCF-521
Project and Location:
The design and construction of a new research facility that contains approximately 68,010 NASF/102,015 GSF which include 600 sq. ft. for classrooms, 4,000 sq. ft. for teaching labs, 45,460 sq. ft. for research labs and 17,950 sq. ft. for offices.
The new building will provide a facility for Physics and Chemistry. Two (2) locations are being considered for this project, which will be discussed with the shortlisted firms.
The Physical Science Building will be located on the
The contract for construction management services will consist of two phases. Phase one is pre-construction services, for which the construction manager will be paid a fixed fee. Phase one services include value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) at 50% Construction Document phase (or other phase, if applicable. If so, change this reference). If the GMP is accepted, phase two, the construction phase, will be implemented. In phase two of the contract, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts, encouraging the inclusion of Minority Business Enterprises (MBEs). Failure to negotiate an acceptable fixed fee for phase one of the contract, or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction managers contract.
Selection of finalists for interviews will be made on the basis of construction manager qualifications, including experience and ability; past experience; bonding capacity; record-keeping/administrative ability; qualification of the firms personnel, staff and consultants. Finalists will be provided with a copy of the building program and the latest documentation prepared by the project architect/engineer, a deion of the final interview requirements and a copy of the standard
Firms desiring to provide construction management services for the project shall submit a letter of application and a completed
All applicants must be licensed to practice as general contractors in the State of
The Construction Manager Qualifications Supplement forms and the Project Fact Sheet may be obtained by contacting: Gina Seabrook, Office of Facilities Planning, University of Central Florida, 4000 Central Florida Boulevard, Orlando, FL 32816-3020, Phone: (407)823-2166, Fax: (407)823-5141, Email: gseabroo@mail.ucf.edu.
The project fact sheet for the Physical Sciences Building and the CMQS Form may be found on the Facilities Planning home page. Our Internet address is: www.fp.ucf.edu.
Four (4) bound copies of the required proposal data shall be submitted to: Mr. Peter Newman, Facilities Planning,