Chapter 62-305, F.A.C., is created to establish procedures and ranking criteria for the selection of urban stormwater retrofitting projects that will receive cost-share funding from the Department through a TMDL Water Quality Restoration Grant.  


  • RULE NO: RULE TITLE
    62-305.100: Scope of the Rule
    62-305.200: Definitions
    62-305.300: General Program Information
    62-305.400: Project Selection Criteria
    62-305.900: Forms
    PURPOSE AND EFFECT: Chapter 62-305, F.A.C., is created to establish procedures and ranking criteria for the selection of urban stormwater retrofitting projects that will receive cost-share funding from the Department through a TMDL Water Quality Restoration Grant.
    SUMMARY: Chapter 2005-291, Laws of Florida, created Section 403.890, F.S. The Water Protection and Sustainability Program, which included funding for the implementation of best management practices and capital project expenditures for urban nonpoint source pollutant load reduction projects needed to achieve TMDL goals. Section 403.890(1)(b), F.S., authorizes the Department to use these funds for cost-share grants and to adopt rules governing the distribution of the funds. Furthermore, the statute also provides that the funds shall not be used to abrogate the financial responsibility of those point and nonpoint sources that have contributed to the degradation of water or land areas.
    Chapter 62-305, F.A.C., establishes definitions, procedures to apply for a grant, matching fund requirements, and project selection ranking factors. Project selection ranking factors include the status of the impaired water, the projected stormwater load reduction, the percentage of local matching funds, the project cost effectiveness, the inclusion of public education components, and whether the applicant has established a dedicated funding source for stormwater management, thereby providing an assurance for the availability of matching funds.
    SUMMARY OF STATEMENT OF ESTIMATED REGULATORY COSTS: A statement of estimated regulatory costs has not been prepared on this rule. This rule establishes a grant program to provide applicants, primarily local governments, with state cost-share dollars to construct urban stormwater treatment systems to reduce pollutant loads discharged to impaired waters.
    Any person who wishes to provide information regarding a statement of estimated regulatory costs, or provide a proposal for a lower cost regulatory alternative must do so in writing within 21 days of this notice.
    SPECIFIC AUTHORITY: 201.15(8), 403.890(1)(b) FS.
    LAW IMPLEMENTED: 201.15(8), 403.890(1)(b) FS.
    IF REQUESTED WITHIN 21 DAYS OF THE DATE OF THIS NOTICE, A HEARING WILL BE SCHEDULED AND ANNOUNCED IN FAW.
    THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE IS: Wanda Harpley, Florida Department of Environmental Protection, Bureau of Watershed Restoration, 2600 Blair Stone Road, MS 3510, Tallahassee, FL 32399-2400, telephone (850)245-8433, or e-mail: Wanda.harpley@dep.state.fl.us. Further information and updates on development of this rule also may be obtained from the Department’s Internet site at: http://www.dep.state.fl.us/water/watersheds/tmdl_grant.htm (OGC No. 08-0815)

    THE FULL TEXT OF THE PROPOSED RULE IS:

    TOTAL MAXMIUM DAILY LOAD WATER QUALITY RESTORATION GRANTS

    62-305.100 Scope of the Rule.

    (1) Florida’s Total Maximum Daily Load (TMDL) Water Quality Restoration Grant program is authorized by Sections 201.15(8) and 403.890(1)(b), F.S., directing the Department to fund the implementation of best management practices, such as regional stormwater treatment facilities, to reduce pollutant loads to impaired waters from urban stormwater discharges. The statutes also authorize the Department to fund research and demonstration of best management practices to reduce pollutant loads from urban nonpoint sources of pollution, especially urban stormwater.

    (2) This rule sets forth the procedures governing the distribution of funding from this program.

    Specific Authority 201.15(8), 403.890(1)(b) FS. Law Implemented 201.15(8), 403.890(1)(b) FS. History–New ________.

     

    62-305.200 Definitions.

    For purposes of this rule chapter:

    (1) “Applicant” means a local government or water management district.

    (2) “Best management practice or BMP” means a control technique that is used for a given set of conditions to reduce urban stormwater pollutant loads in a cost effective manner.

    (3) “Local government” means a municipality, county, district, or authority, or any agency thereof, or a combination of two or more of the foregoing acting jointly in connection with a project and having jurisdiction over the discharge of untreated stormwater to impaired waters.

    (4) “Project” means the implementation of best management practices to retrofit urban drainage systems to reduce pollutant loads discharged to impaired waters.

    (5) “Project costs” means costs for land acquisition, design, permitting, construction, effectiveness monitoring, procurement of equipment and materials, contingency, and the legal and technical services associated with the implementation of best management practices and a TMDL Water Quality Restoration grant.

    (6) “Pollutant of concern” means the pollutant or pollutants that have been identified as causing the impairment of a water body pursuant to the process set forth in Chapter 62-303, F.A.C.

    (7) “Stormwater retrofitting” means the implementation of best management practices to reduce urban stormwater pollutant loads from existing drainage systems or from lands without stormwater treatment that discharge into impaired waters or an existing drainage system.

    (8) “Water management district” means any one of the five water management districts created by Section 373.069, F.S.

    Specific Authority 201.15(8), 403.890(1)(b) FS. Law Implemented 201.15(8), 403.890(1)(b) FS. History–New________.

     

    62-305.300 General Program Information.

    (1) An applicant may apply for a TMDL Water Quality Restoration Grant by completing a TMDL Water Quality Restoration Grant Proposal Application, Form 62-305.900.

    (2) Grant applications may be submitted at any time throughout the year. The Department will review and rank projects three times a year, in March, July, and November. Projects will be selected for grant funding based on these rankings and the availability of funding. Projects not selected for funding will remain in the pool of projects that will be ranked for one year from the date of submittal. Applicants will be notified within 30 days after the review and ranking process whether their project has been selected for grant funding. Once notified of selection, the applicant must provide the Department with a final scope of work and budget so that the Department may develop and execute a grant agreement with the applicant. The number of projects selected for funding during any review and ranking cycle will depend on the availability of funding from the Legislature.

    (3) Match requirements. The applicant for a TMDL Water Quality Restoration Grant shall provide a minimum of 50% of the total project cost in matching funds. At least 25% of the matching funds shall be provided by the local government. Other matching funds can include funding from a water management district or state appropriations. However, applicants shall not match TMDL grant funds with local funds that are used to match water management district funds or state appropriations.

    (4) Allowable project costs. Grant funds may only be used for construction of best management practices, monitoring to determine pollutant load reductions, or public education activities specifically associated with the project. Costs incurred before execution of a contract between the Department and the grant recipient shall be ineligible for reimbursement from grant funds. However, such costs may be included as matching funds. These costs may include, but are not limited to, costs incurred for land acquisition, design, permitting, bidding, project administration and other activities directly associated with the project.

    (5) Project schedule. Projects for which TMDL Water Quality Restoration grant funds are sought shall at least be at the 60% design phase. The Department shall not issue a TMDL Water Quality Restoration Grant until the project has been permitted or the permit has been scheduled for approval at the next meeting of the water management district governing board or Department. Construction of projects selected for funding must be completed within three years of appropriation of the funds by the Legislature unless the funding can be certified forward beyond that timeframe in accordance with state budgeting procedures.

    (6) Load reduction estimates. All applications for project funding shall include an estimate of the projected load reductions to be achieved by implementation of the stormwater treatment best management practices. Estimated load reductions may be calculated using models such as Watershed Management Model (WMM, 2006), Nonpoint Source Loading Management Model (NPSLMM, 2008) and Spreadsheet Tool for Estimating Pollutant Load (STEPL, 2007). The STEPL model is available for download at http://it.tetratech-ffx.com/stepl/ while the other models are available on the TMDL Grant internet site, http://www.dep.state.fl.us/water/watersheds/tmdl_grant.htm).

    (7) Effectiveness monitoring. All projects will include storm event monitoring to determine the actual load reduction associated with implementation of the stormwater treatment best management practices unless such data already exists for the applicable best management practice. The applicant shall be required to put all data from the effectiveness monitoring and required project information into the Department’s Best Management Practice (BMP) Data Base.

    Specific Authority 201.15(8), 403.890(1)(b) FS. Law Implemented 201.15(8), 403.890(1)(b) FS. History–New________.

     

    62-305.400 Project Selection Criteria.

    (1) Projects will be selected for funding using the ranking criteria below and the status of the project with respect to design, permitting, and construction.

    (2) Eligible urban stormwater treatment projects will be ranked for TMDL Water Quality Restoration grant funding based on the priority scoring system set forth below. The maximum number of points for any single project is 490.

    (a) Status of impaired water body.

    1. The project is identified in an adopted basin management action plan. (100 points).

    2. The project reduces loadings to an impaired water body with an adopted TMDL. (75 points).

    3. The project reduces loadings to a water body on the adopted verified list of impaired waters. (50 points).

    4. The project reduces loadings to a water body on the planning list of impaired waters. (20 points).

    5. The project reduces loadings to a water body on the TMDL 1999 consent decree (Florida Wildlife Federation, Inc., Environmental Federation of Southwest Florida, Inc., and Save Our Creeks, Inc. v. Carol M. Browner, Administrator, U.S. Environmental Protection Agency and the U. S. Environmental Protection Agency, Civil Action File No. 4: 98CV356-WS). (10 points).

    (b) Stormwater load reduction of the pollutant of concern.

    The project will reduce urban stormwater loads by the percentages set below:

    1. Loads are reduced by 80 to 100% (100 points).

    2. Loads are reduced by 60 to 79% (75 points).

    3. Loads are reduced by 40 to 59% (50 points).

    4. Loads are reduced by 20 to 39% (30 points).

    5. Loads are reduced by 0 to 19% (10 points).

    (c) Percentage of local matching funds.

    All projects must provide at least 50% matching funds. Points for local matching funds constitute the following percentage of total project costs:

    1. Matching funds are greater than 50% (80 points).

    2. Matching funds between 41% to 50% (60 points).

    3. Matching funds between 31% to 40% (40 points).

    4. Matching funds between 26% to 30% (20 points).

    5. Matching funds are less than 25% (0 points).

    (d) Project cost effectiveness. To provide consideration of the number of urban acres that are being treated by the project and the cost per pound to reduce the pollutant of concern, the scoring system below is established. Points are awarded based on the scoring point system below only if one nutrient is a pollutant of concern. Points are awarded based on the average score from below if both nitrogen and phosphorus are pollutants of concern. Cost percentiles are based on the information from existing TMDL Water Quality Restoration Grants. The dollar amounts associated with cost percentiles will be recalculated on an annual basis using the information in the TMDL Water Quality Restoration Grant data base, available on the program’s internet site. These dollar amounts will be posted on the internet site by January 31 of each year.

    1. Cost per pound of Total Nitrogen removed per acre is in the lowest 20th percentile of project costs (100 Points).

    2. Cost per pound of Total Nitrogen removed per acre is in the 20th to 40th percentile of project costs (75 Points).

    3. Cost per pound of Total Nitrogen removed per acre is in the 40th to 60th percentile of project costs (50 Points).

    4. Cost per pound of Total Nitrogen removed per acre is in the 60th to 80th percentile of project costs (25 Points).

    5. Cost per pound of Total Nitrogen removed per acre is in the 80th to 100th percentile of project costs (10 Points).

    6. Cost per pound of Total Phosphorus removed per acre is in the lowest 20th percentile of project costs (100 Points).

    7. Cost per pound of Total Phosphorus removed per acre is in the 20th to 40th percentile of project costs (75 Points).

    8. Cost per pound of Total Phosphorus removed per acre is in the 40th to 60th percentile of project costs (50 Points).

    9. Cost per pound of Total Phosphorus removed per acre is in the 60th to 80th percentile of project costs (25 Points).

    10. Cost per pound of Total Phosphorus removed per acre is over in the 80th to 100th percentile of project costs (10 Points).

    (e) Educational component. The project includes components to educate targeted audiences about the use of stormwater treatment best management practices to reduce pollutant loads, such as signage, kiosks, field days, workshops, and training programs. Solely notifying the public of the project through news releases or other public relations efforts does not constitute an education program. Points will be awarded as follows:

    1. The educational component consists of kiosks with information on stormwater pollution and treatment at the project site, conducting at least one workshop or field day at the project site, airing public service announcements about stormwater pollution and treatment, and the distribution of printed materials to people within the drainage area served by the project to educate them about how they can reduce stormwater pollution (30 points).

    2. The educational component consists of kiosks with information on stormwater pollution and treatment at the project site and at least one other of the activities listed in number one, above (20 points).

    3. The educational component consists of the distribution of printed materials to people within the drainage area served by the project to educate them about how they can reduce stormwater pollution (10 points).

    (f) Dedicated stormwater funding. If the applicant is a local government or water control district, points will be awarded based on whether they have implemented a dedicated source for stormwater program and project funding. If the dedicated funding source is other than a stormwater utility fee, such as a Municipal Services Taxing Unit (MSTU), a Municipal Services Benefit Unit (MSBU), or a sales tax that is dedicated to stormwater management projects, the applicant shall convert annual costs into a single family monthly Equivalent Rate Unit (ERU). Points will be awarded as follows:

    1. No stormwater utility fee or other dedicated funding source (0 points).

    2. Stormwater utility fee or other dedicated funding source where the single family residence fee is less than $4.30/month (40 points).

    3. Stormwater utility fee or other dedicated funding source where the single family residence fee is greater than $4.30/month (80 points).

    Specific Authority 201.15(8), 403.890(1)(b) FS. Law Implemented 201.15(8), 403.890(1)(b) FS. History–New________.

     

    62-305.900 Forms.

    The application used by the Department for TMDL Water Quality Restoration Grants, “TMDL Water Quality Restoration Grant Proposal Application,” is adopted and incorporated by reference in this section. Copies of form may be obtained from the TMDL Water Quality Grant Restoration internet site at http://www.dep.state.fl.us/water/watersheds/tmdl_grant.htm, from any local district or branch office of the Department, or by writing to the Florida Department of Environmental Protection, Bureau of Watershed Management, 2600 Blair Stone Road (MS3510), Tallahassee, FL 32399:

    TMDL Water Quality Restoration Grant Proposal Application, [Effective Date].

    Specific Authority 201.15(8), 403.890(1)(b) FS. Law Implemented 201.15(8), 403.890(1)(b) FS. History–New________.


    NAME OF PERSON ORIGINATING PROPOSED RULE: Jerry Brooks, Division Director
    NAME OF AGENCY HEAD WHO APPROVED THE PROPOSED RULE: Mimi Drew, Deputy Secretary, Regulatory Programs and Energy
    DATE PROPOSED RULE APPROVED BY AGENCY HEAD: July 29, 2008
    DATE NOTICE OF PROPOSED RULE DEVELOPMENT PUBLISHED IN FAW: June 8, 2008

Document Information

Comments Open:
8/8/2008
Summary:
Chapter 2005-291, Laws of Florida, created Section 403.890, F.S. The Water Protection and Sustainability Program, which included funding for the implementation of best management practices and capital project expenditures for urban nonpoint source pollutant load reduction projects needed to achieve TMDL goals. Section 403.890(1)(b), F.S., authorizes the Department to use these funds for cost-share grants and to adopt rules governing the distribution of the funds. Furthermore, the statute also ...
Purpose:
Chapter 62-305, F.A.C., is created to establish procedures and ranking criteria for the selection of urban stormwater retrofitting projects that will receive cost-share funding from the Department through a TMDL Water Quality Restoration Grant.
Rulemaking Authority:
201.15(8), 403.890(1)(b) FS.
Law:
201.15(8), 403.890(1)(b) FS.
Contact:
Wanda Harpley, Florida Department of Environmental Protection, Bureau of Watershed Restoration, 2600 Blair Stone Road, MS 3510, Tallahassee, FL 32399-2400, telephone (850)245-8433, or e-mail: Wanda.harpley@dep.state.fl.us. Further information and updates on development of this rule also may be obtained from the Department’s Internet site at: http://www.dep.state.fl.us/water/watersheds/tmdl_grant.htm (OGC No. 08-0815)
Related Rules: (5)
62-305.100. Scope of the Rule
62-305.200. Definitions
62-305.300. General Program Information
62-305.400. Project Selection Criteria
62-305.900. Forms