FSU Student Union Replacement (FS-263)
Date 8/07/2019 NOTICE TO BIDDERS
Sealed bids for furnishing all labor and material and performing all work necessary and incidental to the completion of
Bid Group
Bid Package No. & Description
Pre-Bid Date / Time
Bid Date / Time
2.1 - Abatement
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
2.2 – Demolition
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
9.1 – Temporary Drywall and Framing
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
7.1 – Temporary Doors Frames and Hardware
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
7.1 – Temporary Roofing
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
6.1 – Temporary Wood Loading Dock
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
3.1 – Temporary Concrete
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
4.1 – Temporary Masonry
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
21.1 – Temporary Fire Protection
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
22.1 – Temporary Plumbing
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
23.1 – Site and Temporary HVAC
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
26.1 – Site and Temporary Electrical
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
31.1 – Sitework and Utilities
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
2.4 – Retaining Walls
4/19/18 – 10:00 a.m.
5/1/18 – 2:00 p.m.
1.3 – Cranes
10/16/18 – 2:00 p.m.
11/6/18 – 2:00 p.m.
2.3 – Auger Cast Piles
10/16/18 – 2:00 p.m.
11/6/18 – 2:00 p.m.
3.2 – Concrete Foundations
12/4/18 – 10:00 a.m.
12/18/18 – 2:00 p.m.
7.05 – Waterproofing
3/28/19 – 2:00 p.m.
4/16/19 – 2:00 p.m.
5.01 – Structural and Misc. Steel
3/28/19 – 2:00 p.m.
4/16/19 – 2:00 p.m.
3.03 – Cast in Place Concrete
3/28/19 – 2:00 p.m.
4/16/19 – 2:00 p.m.
3.04 – Concrete Shear Walls
3/28/19 – 2:00 p.m.
4/16/19 – 2:00 p.m.
3.02 – Concrete Floor Treatments
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
4.02 – Masonry
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
2.1A – Demolition (Davis Building)
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
5.02 – Specialty Handrails
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
7.03 – Roofing
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
7.04 – Applied Fireproofing
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
8.02 – Doors Frames and Hardware
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
8.03 – Glass, Glazing, Storefronts & Curtainwalls
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
8.04 – Specialty Doors
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
8.05 – Overhead Doors
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
9.02 – Metal Framing and Drywall
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
9.03 – Acoustical Treatments
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
9.05 – Flooring
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
9.09 – Paint, Coatings and Sealants
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
9.13 – Specialty Wall Finishes
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
10.01 – Misc. Specialties
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
10.02 - Signage
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
10.05 – Operable Partitions
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
10.09 – Decorative Metal Canopy
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
11.03 – Food Service Equipment
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
11.04 – Stage Equipment
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
11.07 – Athletic Equipment
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
12.04 – Casework and Millwork
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
13.01 – Special Shade and Awing Structures
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
14.01 – Elevators
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
21.02 – Fire Protection
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
22.02 – Plumbing
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
23.02 - HVAC
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
26.02 – Electrical, Fire Alarm and Data
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
31.01 – Site Utilities
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
31.03 – Exterior Improvements
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
32.01 – Paving
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
32.03 – Fencing
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
32.04 - Landscaping
8/27/19 – 2:00 p.m.
9/26/19 – 2:00 p.m.
** Dates are subject to change. Notice will be given to Pre-Qualified bidders.
for FSU Student Union Replacement (FS-263) will be received by Ajax at 1080 Commerce Blvd., Midway, Florida 32343 or 75 N. Woodward Ave., Tallahassee, Florida 32306 until 2:00 p.m. Local Time, on the above referenced dates.
Pre-Bid Conferences will be held at 75 N. Woodward Ave., Tallahassee, Florida 32306 at the above listed dates and times. Pre-Bid Conferences are not mandatory although bidders are encouraged to attend.
Interested bidders are required to complete Ajax’s pre-qualification process. Only bidders meeting pre-qualification criteria may bid. Bidders must submit a completed experience questionnaire and financial statement on the form entitled “Bidder Qualifications Questionnaire”, incorporated herein by reference. The subcontractor’s financial condition must demonstrate that adequate fixed and liquid assets and equipment are available to properly perform the Subcontract. Bids may be considered non-responsive if bidder has not completed the prequalification process.
For contractors, businesses and trades that are regulated by licensing, bidder must be licensed in the State of Florida.
Bid Documents for FSU Student Union Replacement (FS-263) are scheduled to be made available electronically on 09/06/2019. Interested bidders will receive an invitation to join Ajax’s Procore Project Management System where they may obtain the Bid Documents (drawings, specifications, bid packages, addenda and other bid documents).
No bids may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.
Proposals shall be sealed and plainly marked, "Bid", with name of project, bid package number and description, name and address of bidder, time and date due.
If you are unable to physically submit your bid proposal in hard copy to Ajax, your bid proposal may be submitted via email to lthompson@ajaxbuilding.com prior to the bid closing date and time. If bid proposal is submitted via email, bidder shall scan the complete bid proposal submittal (including bid proposal form, bid proposal affidavit, bid security, and other documents as may be required) and email bid proposal submittal as one (1) electronic (PDF) document. Subject line of email shall be marked “Bid”, with name of project, bid package number and description. Ajax must receive the original hard copies of your complete bid proposal submittal (including bid proposal form, bid proposal affidavit, bid security, and other documents as may be required) in our office at 1080 Commerce Blvd., Midway, Florida 32343 no later than the close of business on the next business day after bids are due. Note: Zip files are not accepted by our email server. If submitting your bid via email, do not include any zip files in attachments. Ajax is not responsible for bids that are not received due to rejected emails or emails that have been designated as spam by the email server.
The Construction Manager reserves the right to reject any and all bids received and to waive any and all informalities or irregularities in regard thereto.
Bid Proposals Totaling $40,000 or Greater
Each bid totaling $40,000 or greater must be accompanied by a Bid Bond on the form enclosed in this Master Bid Package, certified check, or cashier's check in an amount no less than five percent (5%) of the total base bid amount as guarantee that the bidder will, if awarded the contract, enter into a written contract, satisfactory in form, containing a penalty clause and requiring workers' compensation and public liability insurance and approval of subcontractor by Ajax and shall be prepared to provide Payment and Performance Bonds on the forms enclosed in this Master Bid Package to Ajax in the full amount of the contract price within seven (7) days after acceptance.
Bid Proposals Totaling Less Than $40,000
Bid security and bonding requirements do not apply to bid proposals and subcontract awards totaling less than $40,000. At the discretion of Ajax, a shortened Subcontract Agreement form may be used for subcontract awards totaling less than $40,000.
Ajax – Project Contact Information
Title
Name
Phone
Email
Operations Manager
Jeremy Cox
352-409-8997
jcox@ajaxbuilding.com
Senior Project Manager
Chris Kuhn
850-510-3694
ckuhn@ajaxbuilding.com
Project Manager
Michael Jenkins
850-528-8964
mjenkins@ajaxbuilding.com
Assistant Project Manager
John Cappadonna
904-528-8881
jcappadonna@ajaxbuilding.com
Project Engineer
Luke Thompson
850-509-7458
lthompson@ajaxbuilding.com
Senior Superintendent
Wayne Wallace
352-745-1887
wwallace@ajaxbuilding.com
Project Administrator
Jennifer Elkins
850-308-7415
jray@ajaxbuilding.com