National Conductor Constructors; The petition seeks the Board’s interpretation of Section 489.503 (4), F.S., as to whether there are requirements to hold an electrical license to perform the following: electrical substation construction, bus and ...
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
Electrical Contractors’ Licensing Board
NOTICE IS HEREBY GIVEN that on August 20, 2013, the Electrical Contractors’ Licensing Board has received the petition for declaratory statement from National Conductor Constructors. The petition seeks the agency's opinion as to the applicability of Section 489.503 (4), F.S. as it applies to the petitioner.
The petition seeks the Board’s interpretation of Section 489.503 (4), F.S., as to whether there are requirements to hold an electrical license to perform the following: electrical substation construction, bus and wire installation, turbine ISO phase installation and maintenance and inspection of those types of installation. Except for good cause shown, motions for leave to intervene must be filed within 21 days after publication of this notice.
A copy of the Petition for Declaratory Statement may be obtained by contacting: Daniel Biggins, Executive Director, Electrical Contractors’ Licensing Board, 1940 North Monroe Street, Tallahassee, FL 32399-0783, Daniel.Biggins@myfloridalicense.com or by telephoning (850)487-1395.
Document Information
- Meeting:
- Section 489.503 (4), F.S.
- Contact:
- Daniel Biggins, Executive Director, Electrical Contractors’ Licensing Board, 1940 North Monroe Street, Tallahassee, FL 32399-0783, Daniel.Biggins@myfloridalicense.com or by telephoning (850) 487-1395.