61G17-6.003: General Survey, Map, and Report Content
61G17-6.004: Topographic Survey, Map, and Report
PURPOSE AND EFFECT: The Florida Board of Professional Surveyors and Mappers is deleting language from Rule 61G17-6.003(3)(p), F.A.C., to update the rule with language it approved at the Boards hearing involving this rule on January 12, 2006. The Florida Board of Surveyors and Mappers is also correcting rule citations in paragraph 61G17-6.004(3)(a), F.A.C.
SUMMARY: The Florida Board of Professional Surveyors and Mappers is deleting language from paragraph 61G17-6.003(3)(p), F.A.C., which was included by error, in order to update the rule to contain language that the Board approved on January 12, 2006. The Board is also revising paragraph 61G17-6.004(3)(a), F.A.C. to remove incorrect rule citations and replace them with correct rule citations.
SUMMARY OF ESTIMATED REGULATORY COSTS: No Statement of Estimated Regulatory Cost was prepared.
Any person who wishes to provide information regarding a statement of estimated regulatory costs, or provide a proposal for a lower cost regulatory alternative must do so in writing within 21 days of this notice.
SPECIFIC AUTHORITY: 472.008, 472.015, 472.027, 472.003(1)(h) FS.
LAW IMPLEMENTED: 472.015, 472.025, 472.027, 472.033(1)(h) FS.
IF REQUESTED WITHIN 21 DAYS OF THE DATE OF THIS NOTICE, A HEARING WILL BE SCHEDULED AND ANNOUNCED IN FAW.
THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE IS: Rick Morrison, Executive Director, Board of Professional Surveyors and Mappers, 1940 North Monroe Street, Tallahassee, Florida 32399-0767
THE FULL TEXT OF THE PROPOSED RULE IS:
61G17-6.003 General Survey, Map, and Report Content Requirement.
(1) through (3)(o)2. No change.
(p) Map Accuracy. The expected accuracies of features shown on a survey map must be stated.
1. through 2.d. No change.
Specific Authority 472.008, 472.015, 472.027, 472.003(1)(h) FS. Law Implemented 472.015, 472.025, 472.027 FS. HistoryNew 9-1-81, Amended 7-29-85, ________.
61G17-6.004 Specific Survey, Map, and Report Requirements.
(1) through (2) No change.
(3)(a) When the surveyor and mapper provides construction staking, these stakes must be based on controls established using the survey standards set out in Rules 61G17-6.003 and 61G17-6.004, paragraph 61G17-6.003(3)(p) F.A.C., of this chapter. The stakes provided should be adequate in number and position so that the physical items can be constructed from the plans as designed.
(3)(b) through (12)(b)5. No change.
Specific Authority 472.008, 472.027, 472.033(1)(h) FS. Law Implemented 472.027, 472.033(1)(h) FS. HistoryNew 9-1-81, Formerly 21HH-6.04, Amended 12-18-88, Formerly 21HH-6.004, Amended 12-25-95, 5-13-96, 5-25-99, 4-4-06, ________.