Rules Review by JAPC
62. Department of Environmental Protection |
62b. DEP, DIVISION OF BEACHES AND SHORES |
62B-2.001. Shrimp: Regulation |
62B-2.002. Shrimp: Use Of Cast Nets |
62B-2.004. Shrimp: Nassau County |
62B-2.005. Shrimp; Franklin County Area |
62B-2.006. Franklin County |
62B-2.007. Opening An Area In Franklin County |
62B-2.008. Shrimp: Santa Rosa Sound |
62B-2.011. Transporting Of Fresh Headless Shrimp |
62B-2.013. Tortugas Shrimp Area |
62B-3.001. Crawfish |
62B-6.015. Gear And Equipment - Stone Crab Regulation |
62B-15.001. Regulation Of Motorboats, Safety Equipment |
62B-26.001. Description Of The Walton County Coastal Construction Control Line |
62B-26.010. Description Of The Palm Beach County Coastal Construction Control Line |
62B-26.011. Description Of The Pinellas County Coastal Construction Control Line |
62B-26.014. Description Of The Franklin County Coastal Construction Control Line |
62B-26.016. Description Of The Gulf County Coastal Construction Control Line |
62B-26.024. Description Of The Bay County Coastal Construction Control Line |
62B-33.001. Rule And Procedures For Coastal Construction And Excavation (Permits For Construction Seaward Of The Coastal Construction Control Line And Fifty-Foot Setback) Scope |
62B-33.002. Definitions |
62B-33.003. General Prohibitions |
62B-33.004. Exemptions From Permit Requirements |
62B-33.005. General Criteria For Areawide And Individual Permits |
62B-33.006. Coastal Construction Control Line And 50-Foot Setback |
62B-33.007. Structural And Other Requirements Necessary For Permit Approval |
62B-33.008. Application Requirements And Procedures For Areawide And Individual Permits |
62B-33.009. Procedures For Surveying The Coastal Construction Control Or Setback Line |
62B-33.010. Policies And Procedures For Reviewing Established Coastal Construction Control Lines |
62B-33.011. Consultation |
62B-33.012. Processing Procedures |
62B-33.013. Permit Modifications, Time Extensions, Renewals, And Reissuances |
62B-33.014. Emergency Procedures |
62B-33.015. Permit Conditions |
62B-33.016. Transfer Of Permits |
62B-33.017. Time Limits On Permits |
62B-33.019. Suspension And Revocation |
62B-33.020. Violations |
62B-33.021. Civil Penalties |
62B-33.022. Control Line Program Administration To Counties Or Municipalities |
62B-33.023. Coastal County And Municipality Reporting Requirements |
62B-33.024. Thirty-Year Erosion Projection Procedures |
62B-33.0045. Siting And Design Exemptions |
62B-33.0051. Coastal Armoring And Related Structures |
62B-33.0081. Survey Requirements |
62B-33.0085. Application Fees |
62B-33.0086. Electronic Submittals |
62B-33.0155. General Permit Conditions |
62B-33.0225. Partial Control Line Program Administration To Counties Or Municipalities |
62B-34.010. Definitions |
62B-34.020. Purpose |
62B-34.030. Application Procedures |
62B-34.040. Application Fees And Information Requirements |
62B-34.050. General Conditions |
62B-34.055. Minor Structures |
62B-34.060. Non-Habitable Major Structures Including Swimming Pools At Single-Family Dwellings |
62B-34.070. Single Family Dwellings |
62B-34.080. Siting Criteria For Non-Habitable Major Structures, Swimming Pools And Single-Family Dwellings Independent Of A General Permit Line, Or Second Line Construction Or Major Road |
62B-34.085. Minor Reconstruction Of Existing Coastal Armoring Structures |
62B-34.090. Dune Restoration |
62B-34.100. Nassau County |
62B-34.110. Duval County |
62B-34.120. Johns County |
62B-34.130. Flagler County |
62B-34.140. Volusia County |
62B-34.150. Lee County |
62B-34.160. Collier County |
62B-34.170. Sarasota County |
62B-34.180. Manatee County |
62B-34.190. Charlotte County |
62B-34.200. Bay County |
62B-34.210. Escambia County |
62B-34.220. Franklin County |
62B-34.230. Gulf County |
62B-34.240. Brevard County |
62B-34.250. Indian River County |
62B-34.260. Martin County |
62B-34.270. Palm Beach County |
62B-36.001. Purpose |
62B-36.002. Definitions |
62B-36.003. General |
62B-36.004. Project Eligibility |
62B-36.005. Annual Funding Requests |
62B-36.006. Project Ranking Procedure |
62B-36.007. Project Cost Sharing |
62B-36.008. Criteria For Evaluating Project Applications |
62B-36.009. Project Agreements |
62B-36.010. Disbursements Of Program Funds |
62B-36.011. Post Completion Project Review |
62B-41.001. Scope |
62B-41.002. Definitions |
62B-41.003. General Prohibitions |
62B-41.004. Exemptions From Permit Requirements |
62B-41.005. Policy And Eligibility Criteria For Coastal Construction Permits |
62B-41.007. Design, Siting And Other Requirements |
62B-41.008. Information Regarding Permit Application Requirements And Procedures |
62B-41.011. Consultation |
62B-41.012. Processsing Procedure |
62B-41.013. Revisions Or Modifications Of Approved Permits |
62B-41.014. Emergency Permits And Procedures |
62B-41.015. Coastal Construction Permit Conditions |
62B-41.016. Transfer Of Permits |
62B-41.017. Time Limits On Coastal Construction Permits |
62B-41.019. Suspension And Revocation |
62B-41.020. Violations |
62B-41.0055. Protection Of Marine Turtles |
62B-41.0075. Experimental Coastal Construction |
62B-41.0085. Permit Processing And Administration Fees |
62B-41.0125. After-The Fact Permits |
62B-46.001. Scope |
62B-46.002. Oyster Harvesting Prohibited In All Waters Of Franklin County |
62B-46.003. Oyster Harvesting Prohibited In Indian Lagoon In Gulf County |
62B-46.004. Re-Opening Of The Waters Of Franklin County And Indian Lagoon |
62B-47.001. Purpose |
62B-47.002. Definitions |
62B-47.003. Prohibition And Exception |
62B-47.004. Local Government Determination |
62B-49.001. Scope |
62B-49.002. Definitions |
62B-49.003. Policy |
62B-49.004. Consultation |
62B-49.005. Application Requirements And Processing Procedures |
62B-49.006. Fees |
62B-49.007. After-The-Fact Permits And Authorizations |
62B-49.008. Permit Modifications |
62B-49.009. Emergency Permitting Procedures |
62B-49.010. Transfer Of Permits And Authorizations |
62B-49.011. Time Limits On Permits And Authorizations |
62B-49.012. Suspension And Revocation |
62B-49.013. General Conditions |
62B-49.0055. Expedited Permitting Process For Maintenance Projects |
62B-54.001. Definitions |
62B-54.002. Determination Of Fines |
62B-54.003. Determination Of Damages |
62B-54.004. Imposition And Collection Of Fines And Damages |
62B-55.001. Purpose And Intent |
62B-55.009. Monitoring And Reporting Guidance |
62B-56.010. Scope |
62B-56.020. Definitions |
62B-56.030. Permit Criteria For Construction |
62B-56.040. Consultations |
62B-56.050. Permit Application Requirements And Procedures |
62B-56.060. Electronic Submittals |
62B-56.070. Public Comment And Noticing Requirements And Procedures |
62B-56.080. Survey Requirements |
62B-56.090. Financial Assurances |
62B-56.100. Duration Of Permits |
62B-56.110. Permit Modifications |
62B-56.120. Permit Transfers |
62B-56.130. Construction And Maintenance Permit Fees |
62B-56.140. Conversion And Maintenance |
62B-56.150. General Permit Conditions |
62B-56.160. Revocations, Suspensions And Removal |
62B-56.900. Forms |