Subject
CFX Project Nos: 599-224, 599-223, 599-222 & 599-221, respectively
Project Description: CFX Concept, Feasibility & Mobility Studies – Poinciana Parkway Extension / I-4 Connector; Southport Connector Expressway; Northeast Connector Expressway & Osceola Parkway Extension
The Central Florida Expressway Authority (CFX) is conducting concept, feasibility and mobility studies for the above-referenced corridors. CFX is evaluating the four previously studied transportation corridors to determine if they are viable and fundable in accordance with CFX policies and procedures. The corridors are in Osceola County, with small portions in Orange and Polk counties.
All meetings will be held from 5:30 p.m. until 7:30 p.m. The public meetings will be held in an open house format. Community members may come at any point within the advertised time to view the exhibits, to ask questions of study staff and to provide comments. A looping audiovisual presentation providing an overview of the study corridors will be available for viewing throughout the meetings.
The overall goals of these study corridors are to: improve roadway connections from I-4/SR 429 to Florida’s Turnpike, to US 192 and SR 417; provide additional traffic capacity with the study area; enhance mobility of the area’s growing population and economy; reduce congestion and delays on local roads by providing a new limited-access transportation option; provide for the incorporation of transit options; and promote regional connectivity.
The work includes the evaluation and documentation of the physical, natural, social and cultural environments within the corridors and the potential impacts associated with the various mobility alternatives. Transportation demands for each corridor have been determined and a range of transportation mobility options and programs are being developed to adequately meet the future demands.