Subject


The US 41 Charrette will be held along the approximately 3-mile corridor to help develop a plan that will guide the study team in identifying short and long-term recommendations for corridor enhancements. The design elements covered may include capacity, traffic operations, safety, access management, freight, transit, bicycle, and pedestrian movements, as well as land uses, physical design, and connectivity with the larger area. The project team will provide a brief overview of the purpose of the project, discuss existing conditions, and lead an optional field review of the corridor. The US 41 Charrette Workshop s designed to gather and analyze input from various local and regional entities. While the US 41 Charrette Workshop is not specifically open to the public, any member of the public is welcome to join and observe the activities.