Subject
Public workshop and public comment period on draft total maximum daily loads (TMDLs) for Bayou Chico, which is in the Pensacola Basin, and Elevenmile Creek/Tenmile Creek, which is in the Perdido Basin. The TMDLs to be presented at the public workshop are for fecal coliform bacteria.
The public workshop is being held pursuant to Section 403.067(6)(d), Fla. Stat., which requires the Department to hold at least one public workshop in the vicinity of the waterbody or waterbody segment for which a TMDL is being developed. TMDL calculations and allocations for each waterbody or waterbody segment will be adopted by rule, by the Secretary of the Department, pursuant to Sections 120.536(1), 120.54, and 403.805, Fla. Stat. The public workshop is part of the TMDL development and adoption process, as authorized by Section 403.067, Fla. Stat., and anyone wishing to comment as to the development and adoption of the TMDLs is encouraged to attend.
Public Comment Period. The draft TMDL documents for Bayou Chico and Elevenmile Creek will be placed on the Department’s TMDL website (http://www.dep.state.fl.us/water/tmdl) by February 1, 2008 and will be provided upon request to interested parties by mail or via e-mail distribution. To request a copy of the draft TMDL document, contact Jan Mandrup-Poulsen at the mailing address below or call (850) 245-8448. The Department will accept written comments on the draft TMDLs through March 3, 2008 or for 30 days after they are posted, whichever date is later. The purpose of the comment period is to provide an opportunity for public participation in lieu of, or in addition to, participation in the public workshop on the draft TMDLs. Any and all written comments should be directed to:
Jan Mandrup-Poulsen, Environmental Administrator
Watershed Assessment Section
Florida Department of Environmental Protection
Mail Station 3555
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Written comments may also be provided by e-mail directed to: jan.mandrup-poulsen@dep.state.fl.us.