Subject


Project Description: Princeton Street (S.R. 438) and Orange Blossom Trail (U.S. 441) Complete Streets Improvements The City of Orlando, in partnership with Dr. Phillips, Inc. and the Florida Department of Transportation (FDOT), is holding a public hearing regarding planned roadway improvements on segments of Princeton Street (S.R. 438) and Orange Blossom Trail (U.S. 441) in Orlando. The recommended improvements on Princeton Street (S.R. 438) from east of John Young Parkway (S.R. 423) to east of Orange Blossom Trail (U.S. 441) include a four-lane divided roadway with on-street parking, 6-foot wide sidewalks, and 10-foot separated bicycle lanes. The recommended improvements on Orange Blossom Trail (U.S. 441) from south of Industrial Way to north of Traylor Boulevard include a four-lane divided roadway with on-street parking, 6-foot wide sidewalks, and 10-foot separated bicycle lanes. Median access changes are proposed on Princeton Street with the introduction of a raised median.