Subject


The proposed establishment of an Erosion Control Line, pursuant to Section 161.161, Florida Statues. This hearing will consider evidence bearing on the location of a proposed Erosion Control Line for the beach erosion control project known as the Coquina Beach Nourishment Project. The location of the proposed Erosion Control Line is as follows: The proposed Erosion Control Line lies along the island of Anna Maria fronting the Gulf of Mexico at the line of mean high water. The Erosion Control Line lies in Sections 4, 9, 10, and 15 Township 35 South, Range 16 East. Written objections to, or inquires regarding, the proposed Erosion Control Line should be submitted to Catherine Florko, Environmental Specialist III, Florida Department of Environmental Protection, Bureau of Beaches and Coastal Systems, 3900 Commonwealth Boulevard, Mail Station 300, Tallahassee, Florida 32399-3000, prior to the hearing date. The Board of Trustees of the Internal Improvement Trust Fund of the State of Florida reserves the right to deny establishment of the Erosion Control Line.