Subject


Project on SR-25/US-27 from the Broward/Palm Beach County Line to MP 12.626. The project will include the following improvements to extend the roadway pavement's service life and improve safety: resurface the existing pavement, widen the shoulder pavement, closed unused median openings, close abandoned driveways along southbound US-27, modify driveways to better accommodate truck turning movements, replace guardrail, modify the drainage system, upgrade highway signs, and install edge line rumble striping. The hearing will begin as an informal open house at 2:00 pm followed by a formal presentation at 2:30 pm, then a public comment period.