-
-
Construction GP Rule 62-621.300(4)(a).pdf
The document for the Generic Permit for Stormwater Discharge from Large and Small Construction Activities, 62-621.300(4)(a)
6/12/2014
-
-
Construction GP Rule 62-621 300(4)(a).pdf
Page 14 6.2.5 Inspect all distributed areas ... it should say disturbed areas.
Page 22 9.1.4 Any person signing documents under this permit, except contractor or subcontractor certifications under Part 4.5, must make the following certification:
"I certify under penalty of law ... qualified personnel properly gathered and evaluated the information submitted. ... Should be PRESENT TENSE: gather and evaluate.
2/26/2015