25-6.037. Extent of System Which Utility Shall Operate and Maintain  


Effective on Monday, December 30, 2019
  • 1(1) Each utility must operate and maintain in safe, efficient, and proper condition, pursuant to Rules 1725-6.034, 1825-6.0341, 1925-6.0345, 20and 2125-6.040, 22F.A.C., all of the facilities and equipment used in connection with the production, transmission, distribution, regulation, and delivery of electricity to any customer up to the point of delivery. The utility is also responsible for the measurement of electrical consumption consistent with test procedures and accuracies prescribed by the Commission.

    72(2) Each utility must adopt a program governing the inspection of its electric facilities and equipment in order to determine the necessity for replacement and repair. Each utility must keep records to establish compliance with its inspection program.

    110Rulemaking Authority 112350.127(2), 113366.04(6), 114366.05(1) FS. 116Law Implemented 118366.03, 119366.04(1), 120(2)(c), (f), (5), (6), 124366.05(1), 125(3) FS. History–New 7-29-69, Amended 4-13-80, Formerly 25-6.37, Amended 12-30-19.