Florida Administrative Code (Last Updated: April 18, 2024) |
40. Water Management Districts |
40E. South Florida Water Management District |
40E-3. Water Wells |
1(1) The construction, repair, modification, or abandonment of:
9(a) Up to eight (8) sandpoint irrigation, monitor, recovery, dewatering, or gang wells 4 inches or less in diameter; or,
29(b) A Class V air conditioning heat pump system consisting of one supply well and one return well; may be included under one permit provided the conditions of subsection (2) are met.
61(2) A multiple well permit as described in subsection (1) will be issued provided:
75(a) The wells are constructed in the same geologic material, completed in the same aquifer, and drilled on a contiguous tract of land owned or controlled by the same individual or entity; and,
108(b) Each well is the same diameter and constructed of a similar material.
121(3) The District will authorize multi-zone monitor wells consisting of multiple observation tubes monitoring different depths all located in a single larger diameter well casing under a single permit. Provisions listed in subsection (2) do not apply to this type of well.
163(4) When a single well construction permit is issued for multiple wells as described above, a separate well completion report is required for each of the wells or tubes.
192Rulemaking Authority 194373.044, 195373.113, 196373.171, 197373.309, 198373.337 FS. 200Law Implemented 202373.106(1), 203373.309 FS. 205History–New 6-8-15.