62-330.340. Transfer of Permit Upon Change in Ownership or Control  


Effective on Tuesday, December 22, 2020
  • 1(1) Permits in the Operation and Maintenance Phase 9 10Projects 11constructed in accordance with the terms and conditions of a general permit are automatically authorized to be operated and mai31ntained by the permittee and subsequent owners. 38A permittee with a valid 43individual 44permit in the operation and maintenance phase under this chapter or Chapter 62-342, F.A.C., shall notify the Agency 62electronically or 64in writing within 30 days of a change in ownership or control of the entire real property, project, or activity covered by the permit. A processing fee is not required for this notice. The permit shall automatically transfer to the new owner or person in control, except in cases of abandonment, revocation, or modification of a permit as provided in Sections 125373.426 126and 127373.429, F.S. 129If a permittee fails to provide written notice to the Agency within 30 days of the change in ownership or control, or if the change does not include the entire real property or activity covered by the permit, then the transfer shall be governed by subsections (2) through (4), below.

    179(2) Except as provided in subsection (1), 186above, 187and in section 6.3.1 of Volume I, 194or as otherwise required in an individual or conceptual approval permit, 205or for activities authorized under a general permit, 213a permittee shall notify the Agency 219electronically or 221in writing within 30 days of any change in ownership or control of any portion of the real property upon which an activity is permitted under this chapter or Chapter 62-342, F.A.C. A person who obtains an interest in or control of such real property shall:

    267(a) Request transfer of the permit to become the new permittee or modification of the permit to become a co-permittee; or

    288(b) Provide written documentation of the following:

    2951. Certification that the permittee continues to retain sufficient real property interest over the land upon which the activities subject to the permit will be conducted as described in s325ection 4.2.3(d) of Volume I; 330and

    3312. Authorization for Agency staff with proper identification to enter, inspect, sample and test the project or activities to ensure conformity with the plans and specifications authorized in the permit.

    361(3) The person requesting transfer of the permit shall submit to the Agency a completed Form 37762-330.340(1), 378“Request to Transfer Environmental Resource and/or State 404 Program Permit,” incorporated by reference herein 393(394December 22, 2020397) (399https://www.flrules.org/Gateway/reference.asp?No=Ref-12039401), 402a copy of which may be obtained from the Agency, as described in subsection 41662-330.010(5), 417F.A.C., t419ogether with the permit modification fee prescribed by the Agency as set forth in Rule 43462-330.071, 435F.A.C. A proposed new permittee shall demonstrate that it has sufficient real property interest in or control over the land consistent with subsection 45862-330.060(3), 459F.A.C.

    460(a) The Request to Transfer Environmental Resource and/or State 404 Program Permit shall be processed in the same manner as a minor modification as provided in subsection 48762-330.315(2), 488F.A.C.

    489(b) The proposed new permittee shall include demonstration or documentation with the request that it meets the requirements for being an acceptable operation and maintenance entity provided in subsections 51862-330.310(2) 519and (3), F.A.C., if applicable.

    524(4) Upon receipt of the completed Request to Transfer Environmental Resource and/or State 404 Program Permit form and applicable processing fee, the Agency shall approve the permit transfer unless it determines that the proposed permittee or co-permittee has failed to provide reasonable assurances that it qualifies to be a permittee or that it can meet the permit conditions.

    582(a) If the Agency proposes to deny the transfer, it shall provide both the current permittee and the proposed permittee with notice of proposed agency action of denial, and of the right to request an administrative hearing pursuant to Chapter 120, F.S.

    624(b) Failure of the permittee to notify the Agency in writing within 30 days of a change in ownership or control shall not, by itself, render a permit invalid. When it does not appear the current permittee has met the requirements of subsection (2), above, or has not otherwise approved or been made aware of the request to transfer the permit, upon transfer of the permit to the new permittee, the Agency will provide notice to the former permittee, at its last known address, advising of the permit transfer, together with a notice of rights under Chapter 120, F.S.

    723(5) A permittee from whom the permit is transferred shall:

    733(a) Be jointly and severally liable with the new owner or permittee for compliance with the permit and for any corrective actions that may be required as a result of violations of the permit or Agency rule on the property prior to permit transfer; and

    778(b) Remain jointly and severally liable for any corrective actions that are required as a result of any violations of the permit that occurred prior to the change in ownership or control of the property upon which the permitted project or activity is located.

    822(6) Upon transfer of a permit, the new permittee shall comply with all terms and conditions of the permit.

    841Editor notes: The effective date of the rule will be effective date of assumption, which is the date identified by EPA as published in the Federal Register §869373.4146, F.S.