Florida Administrative Code (Last Updated: June 27, 2024) |
![]() |
62. Department of Environmental Protection |
![]() |
D62. Departmental |
![]() |
62-600. Domestic Wastewater Facilities |
1(1) Wastewater treatment facilities which are designed so that some or all of the reclaimed water or effluent may enter ground waters shall conduct ground water monitoring in accordance with Chapter 62-520, F.A.C., and this chapter.
37(2) Where reclaimed water is applied to multiple sites permitted under Part III of Chapter 62-610, F.A.C., one or more of the sites (representative of each site’s hydrogeological characteristics, soil characteristics, vegetative cover, and reclaimed water application method, etc.) shall be selected by the applicant and approved in writing by the Department as the model site(s) for monitoring the ground water.
98(3) The minimum schedule for ground water monitoring is specified in Figure 2 below:
112Figure 2. Minimum Sampling Frequency for Ground Water Monitoring
121Parameter
122Reuse and Land
125Application Systems –
128New facilities1301 131with a design capacity < 100,000 gpd
135Reuse and Land
138Application Systems – New facilities1431 144with a d147esign capacity ≥ 100,000 gpd and existing facilities
156Injection to Aquifer Storage and Recovery (ASR) Systems
164Injection to Class F-I, G-I, or G-II Ground Water, except ASR Systems
176Injection to Ground Water, except to Class F-I, G-I, G-II, or ASR Systems
189Wa190ter Level
192Semiannually
193Quarterly
194Quarterly
195Monthly
196Monthly
197Total
198Nitrate Nitrogen
200(as N)
202Semiannually
203Quarterly
204Monthly
205Total Dissolved Solids
208Semiannually
209Quarterly
210Monthly
211Arsenic,
212Total Recoverable
214Semiannually
215Quarterly
216Cadmium,
217Total Recoverable
219Semiannually
220Quarterly
221Chloride (as Cl)
224Semiannually
225Quarterly
226Chromium,
227Total Recoverable
229Semiannually
230Quarterly
231Lead, Total Recoverable
234Semiannually
235Quarterly
236Fecal Coliform
238Semiannually
239Quarterly
240Quarterly
241pH
242Semiannually
243Quarterly
244Total Sulfate
246Semiannually
247Quarterly
248Total Kjeldahl Nitrogen (as N)
253Monthly
254Monthly
255Total Phosphorus
257(as P)
259Monthly
260Turbidity
261Semiannually
262Quarterly
263Quarterly
264Monthly
265Monthly
266Specific Conductance
268Quarterly
269Ground Water Standards2722
273Quarterly
274Quarterly
2751276In accordance with subsection 28062-520.600(10), 281F.A.C., new facilities are facilities which have filed a complete permit application after July 1, 1994.
2972298As specified in rules 30262-520.420, 30362-520.460 304and 30562-550.830, 306F.A.C.
307(4) G309rab samples shall be used to test for all ground water parameters.
321(5) Monitoring wells shall be purged prior to sampling to obtain a representative sample.
335Rulemaking Authority 337403.061(7) FS. 339Law Implemented 341403.061(13) FS. 343History‒New 2-8-16, Amended 9-23477-21.