62-704.410. Procedure for the Final Examination and Certification of Resource Recovery Equipment  


Effective on Sunday, November 15, 2009
  • 1Final examination and certification of resource recovery equipment shall be a requirement for sales tax exemptions as indicated in Section 21212.08(7)22(23q24), F.S. The Department shall use the following procedure in granting or denying certification of resource recovery equipment:

    42(1) After the equipment is installed, an application for final examination and certification of resource recovery equipment shall be submitted to the Department on Form 6762-701.90068(69970). The application shall include the information required for preliminary examination in subsection 8362-704.400(1), 84F.A.C., and the Department shall request additional information if required for proper completion of the application. If the applicant has previously submitted the required information on a preliminary examination application form, then an updated copy of that preliminary examination application form shall satisfy this requirement.

    129(2) An application for final examination and certification of resource recovery equipment 141that 142includes only recycling equipment may or may not include equipment appearing on the list in Rule 15862-704.600, 159F.A.C.

    160(a) For equipment appearing on the list in Rule 16962-704.600, 170F.A.C., the purchaser shall include with the application a certification that:

    1811. The equipment meets the criteria in Rule 18962-704.420, 190F.A.C., and

    1922. The listed equipment is installed 198and operational200.

    201(b) For equipment not appearing on the list in Rule 21162-704.600, 212F.A.C., or for listed equipment 217that 218has auxiliary equipment also being certified as recycling equipment, the application shall include a certification by a Professional Engineer that:

    2381. The equipment meets the criteria in Rule 24662-704.420, 247F.A.C., and

    2492. The equipment is installed 254and operational256.

    257(c) If the applicant has previously submitted the required information on a preliminary examination application form, then an updated copy of that preliminary examination application form shall satisfy this requirement.

    287(3) To provide the certification required in this subsection for final examination and certification of resource recovery equipment, that is recycling equipment, a Professional Engineer shall examine the plans, drawings, and descriptions of the facility and process and the attached equipment list. The Professional Engineer shall inspect the installed equipment. The Professional Engineer shall certify that the equipment is:

    346(a) Integral to the recycling process;

    352(b) Owned and operated by or on behalf of a unit of local government; and

    367(c) Installed and operational.

    371(4) When the proposed resource recovery equipment is installed, a representative of the Department shall inspect the equipment within 390thirty (39230393) 394days of receipt of a properly completed application. However, the Department shall accept certification of equipment and installation specified in subsection (2) 416of this section 419in lieu of inspecting such recycling equipment when the Department finds that such certification is sufficient to determine that the recycling equipment meets the criteria of this rule.

    447(5) Within 449thirty (45130452) 453days of such inspection or receipt of a complete and sufficient certification of equipment and installation as specified in subsection (2) 474of this section, 477the Department shall issue a written decision granting or denying certification. A copy of the certification shall be sent to the Department of Revenue and the Applicant.

    504Rulemaking 505Authority 403.705074 508FS. Law Implemented 511212.08(7)512(513q514), 515403.715 FS. 517History–New 5-24-79, Formerly 17-7.43, 17-7.430, Amended 8-14-90, Formerly 17-704.410, Amended 12-17-96, 52811-15-09.