Published on: 23105223. To repeal Rule 25-6.0342, F.A.C., because it is duplicative of another Commission rule, and is obsolete and unnecessary.
Docket No. 20200063-EI
Published on: 22222329. Public electric utility storm protection plans and storm protection cost recovery clause rulemaking to implement Section 366.96, F.S.
Docket No. 20190131-EU
; Tuesday, August 20, 2019, at 9:30 a.m.; Room 148, Betty Easley Conference Center, 4075 Esplanade Way, Tallahassee, Florida.
Published on: 21954221. To implement Section 366.96, FS, which was passed by the Florida Legislature in the 2019 session. Section 366.96, FS, requires public electric utilities to file storm protection plans with the Commission and allows a public electric utility to petition for cost recovery annually through a storm plan cost recovery clause. To adopt new rules and to determine whether existing rules should be amended or repealed to implement Section 366.96, FS.
Undocketed
Published on: 4174606. a variance from Rule 25-6.0342(2), Florida Administrative Code from Florida Public Utilities Company in Docket No. 070300-EI. The rule requires all investor-owned utilities to file storm hardening plans no later than 90 days after the effective date of the rule (May 7, 2007). Comments on the petition should be filed with the Florida Public Service Commission, Office of the Commission Clerk and Administrative Services, 2540 Shumard Oak Boulevard, Tallahassee, Florida 32399-0850, within 14 days after publication of this notice.
Published on: 3334974. Standard of Construction, Location of the Utility’s Electric Distribution Facilities, Third-Party Attachment Standards and Procedures, Safety Standards for Construction of New Transmission and Distribution Facilities, Extension of Facilities; Contribution in Aid of Construction, Schedule of Charges, Facility Charges for Providing Underground Facilities of Public Distribution Facilities Excluding New Residential Subdivisions
Published on: 530898. Standard of Construction, Extension of Facilities; Contribution in Aid of Construction, Schedule of Charges, Facility Charges for Providing Underground Facilities of Public Distribution Facilities Excluding New Residential Subdivisions, Location of the Utility’s Electric Distribution Facilities, Third-Party Attachment Standards and Procedures, Municipal Electric Utilities and Rural Electric Cooperatives, Safety Standards for Construction of New Transmission and Distribution Facilities