To implement Section 366.96, FS, which was passed by the Florida Legislature in the 2019 session. Section 366.96, FS, requires public electric utilities to file storm protection plans with the Commission and allows a public electric utility to ...
RULE NOS: RULE TITLES
Rule 25-6.0143 Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4
Rule 25-6.030 Storm Protection Plan
Rule 25-6.031 Storm Protection Plan Cost Recovery Clause
Rule 25-6.034 Standard of Construction
Rule 25-6.0341 Location of the Utility’s Electric Distribution Facilities
Rule 25-6.0342 Electric Infrastructure Storm Hardening
Rule 25-6.0343Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements
Rule 25-6.0345Safety Standards for Construction of New Transmission and Distribution Facilities
Rule 25-6.044Continuity of Service
Rule 25-6.0455Annual Distribution Service Reliability Report
Rule 25-6.061Relocation of Poles
Rule 25-6.064Contribution-in-Aid-of-Construction for Installation of New or Upgraded Facilities
Rule 25-6.077Installation of Underground Distribution Systems within New Subdivisions
Rule 25-6.078Schedule of Charges
Rule 25-6.081Construction Practices
Rule 25-6.115Facility Charges for Conversion of Existing Overhead Investor-owned Distribution Facilities
PURPOSE AND EFFECT: To implement Section 366.96, FS, which was passed by the Florida Legislature in the 2019 session. Section 366.96, FS, requires public electric utilities to file storm protection plans with the Commission and allows a public electric utility to petition for cost recovery annually through a storm plan cost recovery clause. To adopt new rules and to determine whether existing rules should be amended or repealed to implement Section 366.96, FS.
Undocketed
SUBJECT AREA TO BE ADDRESSED: Public electric utility storm protection plans and storm protection cost recovery clause.
RULEMAKING AUTHORITY: 350.127(2), 366.05(1), 366.96, FS.
LAW IMPLEMENTED: 350.115, 366.03, 366.04(1), (2), (4)–(6), 366.041(1), (4), 366.05(1), (7), 366.06(1), 366.96, FS.
A RULE DEVELOPMENT WORKSHOP WILL BE HELD AT THE DATE, TIME, AND PLACE SHOWN BELOW:
DATE AND TIME: Tuesday, June 25, 2019, 9:30 a.m.
PLACE: Room 148, Betty Easley Conference Center, 4075 Esplanade Way, Tallahassee, Florida.
One or more Commissioners may be in attendance and participate in the workshop. In accordance with the Americans with Disabilities Act, persons needing a special accommodation to participate at this workshop should contact the Office of Commission Clerk no later than five days prior to the workshop at 2540 Shumard Oak Boulevard, Tallahassee, Florida 32399-0850 or (850)413-6770 (Florida Relay Service, 1(800)955-8770 Voice or 1-(800)955-8771 TDD). Assisted Listening Devices are available upon request from the Office of Commission Clerk, Gerald L. Gunter Building, Room 152.
THE PERSONS TO BE CONTACTED REGARDING THE PROPOSED RULE DEVELOPMENT AND A COPY OF THE PRELIMINARY DRAFT, IF AVAILABLE, ARE: Adria Harper, (850)413-6082, aharper@psc.state.fl.us or Andrew King, (850)413-6195, aking@psc.state.fl.us. A copy of the agenda and materials for the workshop will be posted on the Commission’s website, www.floridapsc.com, under the Rule Development tab on June 11, 2019.
THE PRELIMINARY TEXT OF THE PROPOSED RULE DEVELOPMENT IS AVAILABLE AT NO CHARGE FROM THE CONTACT PERSONS LISTED ABOVE.
Document Information
- Subject:
- Public electric utility storm protection plans and storm protection cost recovery clause.
- Purpose:
- To implement Section 366.96, FS, which was passed by the Florida Legislature in the 2019 session. Section 366.96, FS, requires public electric utilities to file storm protection plans with the Commission and allows a public electric utility to petition for cost recovery annually through a storm plan cost recovery clause. To adopt new rules and to determine whether existing rules should be amended or repealed to implement Section 366.96, FS. Undocketed
- Rulemaking Authority:
- 350.127(2), 366.05(1), 366.96, FS
- Law:
- 350.115, 366.03, 366.04(1), (2), (4)–(6), 366.041(1), (4), 366.05(1), (7), 366.06(1), 366.96, FS
- Related Rules: (15)
- 25-6.0143. Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4
- 25-6.030. Storm Protection Plan
- 25-6.031. Storm Protection Plan Cost Recovery Clause
- 25-6.034. Standard of Construction
- 25-6.0341. Location of the Utility’s Electric Distribution Facilities
- More ...