Published on: 23737372. To update and clarify the rules, including updating the rules to recognize the Commission’s adoption of Rule 25-6.030, Storm Protection Plan, and the repeal of Rule 25-6.0342.
Docket No. 20200091-EU
Published on: 23227055. NOTICE IS HEREBY GIVEN by the Florida Public Service Commission that Tampa Electric Company’s petition for waiver of Rule 25-6.064, Limited Alternative Rate Increase, Florida Administrative Code, filed on January 6, 2020, in Docket No. 20200011-EI, was granted by the Commission by Order No. PSC-2020-0108-PAA-EI, issued on April 16, 2020, and consummated by Order No. PSC-2020-0136-CO-EI, issued on May 8, 2020. The rule establishes a uniform procedure by which investor-owned electric utilities calculate amounts due as contributions in aid of construction from customers who request new facilities or upgraded facilities in order to receive electric service. A temporary 5-year waiver subject to the condition of annual reporting requirements was granted from paragraph 25-6.064(2)(c) for calculating CIAC for installing primary voltage power lines for electric vehicle fast charging stations. The petition was granted on the basis that the purpose of the underlying statute would be achieved by other means and application of the rule would create a substantial hardship for the temporary and limited purpose of the pilot program. Notice of the petition was published in the FAR on January 9, 2020, Vol. 46, No. 06.
Published on: 22222329. Public electric utility storm protection plans and storm protection cost recovery clause rulemaking to implement Section 366.96, F.S.
Docket No. 20190131-EU
; Tuesday, August 20, 2019, at 9:30 a.m.; Room 148, Betty Easley Conference Center, 4075 Esplanade Way, Tallahassee, Florida.
Published on: 21954221. To implement Section 366.96, FS, which was passed by the Florida Legislature in the 2019 session. Section 366.96, FS, requires public electric utilities to file storm protection plans with the Commission and allows a public electric utility to petition for cost recovery annually through a storm plan cost recovery clause. To adopt new rules and to determine whether existing rules should be amended or repealed to implement Section 366.96, FS.
Undocketed
Published on: 3334974. Standard of Construction, Location of the Utility’s Electric Distribution Facilities, Third-Party Attachment Standards and Procedures, Safety Standards for Construction of New Transmission and Distribution Facilities, Extension of Facilities; Contribution in Aid of Construction, Schedule of Charges, Facility Charges for Providing Underground Facilities of Public Distribution Facilities Excluding New Residential Subdivisions
Published on: 530898. Standard of Construction, Extension of Facilities; Contribution in Aid of Construction, Schedule of Charges, Facility Charges for Providing Underground Facilities of Public Distribution Facilities Excluding New Residential Subdivisions, Location of the Utility’s Electric Distribution Facilities, Third-Party Attachment Standards and Procedures, Municipal Electric Utilities and Rural Electric Cooperatives, Safety Standards for Construction of New Transmission and Distribution Facilities