Published on: 25893100. that Florida Power & Light Company’s (FPL) petition filed on January 7, 2022, seeking a temporary waiver of Rule 25-6.078(3), Florida Administrative Code, in Commission Docket No. 20220012-EI, was addressed by Order No. ....
Published on: 23737372. To update and clarify the rules, including updating the rules to recognize the Commission’s adoption of Rule 25-6.030, Storm Protection Plan, and the repeal of Rule 25-6.0342.
Docket No. 20200091-EU
Published on: 22222329. Public electric utility storm protection plans and storm protection cost recovery clause rulemaking to implement Section 366.96, F.S.
Docket No. 20190131-EU
; Tuesday, August 20, 2019, at 9:30 a.m.; Room 148, Betty Easley Conference Center, 4075 Esplanade Way, Tallahassee, Florida.
Published on: 21954221. To implement Section 366.96, FS, which was passed by the Florida Legislature in the 2019 session. Section 366.96, FS, requires public electric utilities to file storm protection plans with the Commission and allows a public electric utility to petition for cost recovery annually through a storm plan cost recovery clause. To adopt new rules and to determine whether existing rules should be amended or repealed to implement Section 366.96, FS.
Undocketed
Published on: 3334974. Standard of Construction, Location of the Utility’s Electric Distribution Facilities, Third-Party Attachment Standards and Procedures, Safety Standards for Construction of New Transmission and Distribution Facilities, Extension of Facilities; Contribution in Aid of Construction, Schedule of Charges, Facility Charges for Providing Underground Facilities of Public Distribution Facilities Excluding New Residential Subdivisions
Published on: 530898. Standard of Construction, Extension of Facilities; Contribution in Aid of Construction, Schedule of Charges, Facility Charges for Providing Underground Facilities of Public Distribution Facilities Excluding New Residential Subdivisions, Location of the Utility’s Electric Distribution Facilities, Third-Party Attachment Standards and Procedures, Municipal Electric Utilities and Rural Electric Cooperatives, Safety Standards for Construction of New Transmission and Distribution Facilities
Published on: 305858. To amend rules to require utilities to meet higher standards for the construction of overhead electrical transmission and distribution facilities to better withstand the effects of extreme weather events, including the establishment of appropriate standards and procedures to assure that third-party facilities attached to electric distribution poles and use of third-party poles do not impair the safety of workers or the public, do not impair electric system reliability, do not exceed pole capacity, and are constructed, installed, maintained, and operated in accordance with generally accepted engineering practices.