Published on: 22269277. The purpose and effect of the proposed rule development is to add two new rules to Chapter 62-701 in order to 1) adopt the federal regulations in 40 CFR Part 257.50 through 257.107, “Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments” by reference into Chapter 62-701, F.A.C., through the fast track process in section 403.8055, F.S., and 2) adopt procedures in Rule 62-701.805, F.A.C., by which the Department of Environmental Protection will issue Coal Combustion Residuals Permits to facilities in Florida that are currently required to comply with the requirements in 40 CFR Part 257.50 through 257.107.
Published on: 15103693. The Department is proposing to amend Chapter 62-701, F.A.C., which contains regulations for a wide variety of solid waste facilities including landfills, construction and demolition (C&D) debris disposal facilities, and waste processing and recycling facilities. This chapter was last amended with an effective date of August 12, 2012. Subsection 403.707(9), F.S., requires that all construction and demolition debris landfills be constructed with liners and leachate control systems. Amendments are being made to the chapter to implement these changes in the statutes. In addition, a number of simplifying changes are being proposed to the chapter with the goals of: (1) reducing unnecessary regulations; (2) reducing costs to the regulated community; and, (3) clarifying existing regulations. These measures will result in a significant savings to the regulated community while continuing to provide effective environmental protection.
Published on: 14890099. The Division of Environmental Assessment and Restoration will bring before the ERC an amendment to Rule 62-302.800, F.A.C., for adoption. The amendment proposes to establish Site Specific Alternative Criteria (SSAC) for pH in Pace Swamp in Santa Rosa County. The SSAC would set an upper limit of 7.0 standard units not to be exceeded more than ten percent of the time during any calendar year and a lower limit that would maintain natural background conditions.
Additionally, the Division of Waste Management (DWM) will BRIEF the ERC on proposed Phase II changes to Ch. 62-701. The proposed changes continue the efforts to clarify and streamline the solid waste rules and incorporate changes required by Florida Statutes.
The DWM will publish notice of the date and time for the rule adoption hearing before the ERC.; August 21, 2014 at 10:00 a.m.; Conference Room A, Douglas Building, 3900 Commonwealth Blvd., Tallahassee, FL 32344; or by teleconference at 1-888-670-3525, Chairperson Code: 156-956-7386 #; and/or by webinar at: [LINK]
Published on: 14350100. that on March 18, 2014, HAS Golden on behalf of the Florida Roof Recycling Materials Recovery Facility, Orange County, withdrew a petition for variance or waiver that had been submitted on December 6, 2013. The Petitioner had requested a waiver from paragraph 62-701.710(7)(a), F.A.C., which requires that owners and operators of waste processing facilities provide financial assurance in the amount of the closing cost estimate for the facility. The Petitioner has decided to provide financial assurance required by the rule rather than seek a variance.
Published on: 14236610. : This is a rule development workshop to discuss proposed Phase II changes to Chapter 62-701, Solid Waste Management Facilities. The workshop will focus on rules relating to liner requirements for construction and demolition debris facilities, processing construction and demolition debris prior to disposal where economically feasible, investigation of sinkhole potential at landfills, and updates to the requirements for financial assurance. The workshop will also address other potential changes to the rule. The workshop will be available via webinar. Those unable to attend the workshop in person may register for the webinar by going to this web address: https://www2.gotomeeting.com/register/949512634.; March 14, 2014, beginning at 9:00 a.m.; DEP, 2600 Blair Stone Road, Room 609, Tallahassee, Florida
Published on: 13927762. variance or waiver from HAS Golden for the Florida Roof Recycling Materials Recovery Facility, Orange County, Florida. The Petitioner requests a waiver from paragraph 62-701.710(7)(a), F.A.C., which requires that owners and operators of waste processing facilities provide financial assurance in the amount of the closing cost estimate for the facility. Any interested person or other agency may submit written comments on the petition with 14 days after publication of this notice.
Published on: 13712616. This is a rule development workshop to discuss proposed Phase II changes to Chapter 62-701, Solid Waste Management Facilities. The workshop will focus on rules relating to liner requirements for construction and demolition debris facilities, processing construction and demolition debris prior to disposal where economically feasible, investigation of sinkhole potential at landfills, requirements facilitating the use of insurance policies to meet financial assurance obligations, and requirements related to the beneficial use of ash from waste-to-energy facilities. The workshop will also address other potential changes to the rule. The workshop will be available via webinar. Those unable to attend the workshop in person may register for the webinar by going to this web address: https://www2.gotomeeting.com/register/543765682.; November 8, 2013, beginning at 9:00 a.m.; 2600 Blair Stone Road, Room 609, Tallahassee, Florida