Seth G. Simmons; The petitioner seeks a declaratory statement as to whether pursuant to 489.105(3)(a), 489.105(n) and 489.113(3)(d) a Certified General Contractor and/or a Certified Underground Utility & Excavation Contractor can install pre-...
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
Construction Industry Licensing Board
NOTICE IS HEREBY GIVEN that on November 6, 2015, the Construction Industry Licensing Board has received the petition for declaratory statement from Seth G. Simmons. The petition seeks the agency’s opinion as to the applicability of Sections 489.105(3)(a), 489.105(n) and 489.113(3)(d), FS, as they apply to the petitioner.
The petitioner seeks a declaratory statement as to whether pursuant to Sections 489.105(3)(a), 489.105(n) and 489.113(3)(d) a Certified General Contractor and/or a Certified Underground Utility & Excavation Contractor can install pre-engineered and pre-fabricated PVC or fiberglass ductwork integral and connected to an odor control system at a municipal treatment and/or collection facility without having to subcontract the work to a mechanical, plumbing, or air conditioning contractor. Except for good cause shown, motions for leave to intervene must be filed within 21 days after publication of this notice.
A copy of the Petition for Declaratory Statement may be obtained by contacting: Dan Biggins, Executive Director, Construction Industry Licensing Board, 1940 North Monroe Street, Tallahassee, FL 32399, (850)487-1395 or by email: Amanda.Wynn@myfloridalicense.com.
Document Information
- Meeting:
- 489.105(3)(a), 489.105(n) and 489.113(3)(d) FS
- Contact:
- Dan Biggins, Executive Director, Construction Industry Licensing Board, 1940 North Monroe Street, Tallahassee, FL 32399, (850)487-1395, or by electronic mail - Amanda.Wynn@myfloridalicense.com.