Other Agencies and Organizations, Peter R. Brown Construction  


  • Request for Subcontractor Proposals PCHD Tobacco Awareness Addition – Notice of Request for Proposals

    Florida Department of Health

    Pasco County Health Department

    Tobacco Awareness Addition (DOH #70751100)

    North Port, FL

    Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the Florida Department of Health and Florida Department of Health, Sarasota County Health Department, Tobacco Awareness Addition hereby solicits sealed subcontractor proposals for the referenced project in accordance with the proposal documents to include but not limited to the following:

    01B       Final Cleaning                                                             09C       Ceramic Tile

    02A      Site Work                                                                     09D       Acoustical Ceilings

    02B       Selective Demolition                                                  09E        Flooring

    02D       Landscaping                                                               09G        Painting

    03A       Concrete                                                                     10A        Miscellaneous Accessories

    04A       Masonry                                                                     10C        Interior Signs

    06A       Wood Trusses & Sheathing                                    10D       Operable Partition

    07A       Shingle Roofing                                                         11A       Audio/Visual Display Boards

    07C        Joint Sealants                                                             12A      Window Treatments

    08A       Doors, Frames, Hardware & Installation                15A       Fire Sprinkler System

    08C        Windows                                                                     15B       Plumbing

    09A       Stucco                                                                           15C       HVAC

    09B        Drywall Partitions                                                        16A      Electrical

    A pre-proposal meeting will be held at 10:30 a.m. (Local Time), Tuesday November 25, 2008, at the following location:

    Sarasota County Health Department

    10841 Little Road

    New Port Richey, FL 34654

    Deadline for receipt of All Proposal Packages has been set for 2:00 p.m., December 16, 2008. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.

    All interested subcontractors must be pre-qualified or have completed the pre-qualification process within the last year. Subcontractors must submit pre-qualification prior to December 11, 2008, in order to be considered for this project. Please contact the following person to obtain information or documents about the pre-qualification requirements for this project:

    Jenny Sanchez, Estimator

    Phone: (727)535-6407 – Fax: (727)539-8485

    Florida Department of Health and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.

    One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available November 7, 2008. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.

    Florida Department of Health and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities.

    No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by December 11, 2008. The Owner and Architect will not accept calls regarding this project.

Document Information