Other Agencies and Organizations, Peter R. Brown Construction  


  • Request for Subcontractor Proposals SCHD Tobacco Awareness Addition – Revised Notice of Request for Proposals

    Florida Department of Health

    Sarasota County Health Department

    Tobacco Awareness Addition (DOH #70758100)

    North Port, FL

    Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the Florida Department of Health and Florida Department of Health, Sarasota County Health Department, Tobacco Awareness Addition hereby solicits sealed subcontractor proposals for the referenced project in accordance with the proposal documents to include but not limited to the following:

    01B        Final Cleaning                                                       09C        Ceramic Tile

    02A       Site Work                                                               09D        Acoustical Ceilings

    02B        Selective Demolition                                            09E         Flooring

    02D        Landscaping                                                         09G         Painting

    03A       Concrete                                                                 10A        Miscellaneous Accessories

    04A       Masonry                                                                 10C        Interior Signs

    06A       Wood Trusses & Sheathing                               10D        Operable Partition

    07A       Shingle Roofing                                                    11A        Audio/Visual Display Boards

    07C        Joint Sealants                                                        12A        Window Treatments

    08A       Doors, Frames, Hardware & Installation           15A        Fire Sprinkler System

    08C        Windows                                                                15B        Plumbing

    09A       Stucco                                                                     15C        HVAC

    09B        Drywall Partitions                                                 16A        Electrical

    A pre-proposal meeting will be held at 10:30 a.m. (Local Time), Tuesday, November 18, 2008, at the following location:

    Sarasota County Health Department

    North Port Health & Family Service Center

    6950 Outreach Way

    North Port, FL 34287

    Deadline for receipt of All Proposal Packages has been set for 2:00 p.m., December 9, 2008. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.

    All interested subcontractors must be pre-qualified or have completed the pre-qualification process within the last year. Subcontractors must submit pre-qualification prior to December 4, 2008, in order to be considered for this project. Please contact the following person to obtain information or documents about the pre-qualification requirements for this project:

    Jenny Sanchez, Estimator

    Phone: (727)535-6407 – Fax: (727)539-8485

    Florida Department of Health and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.

    One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available November 7, 2008. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.

    Florida Department of Health and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities.

    No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by December 4, 2008. The Owner and Architect will not accept calls regarding this project.

Document Information