The Department of Environmental Protection proposes amendments to Chapter 62B-33, F.A.C., Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line (CCCL) and 50-Foot ...
DEPARTMENT OF ENVIRONMENTAL PROTECTION
RULE NOS.:RULE TITLES:
62B-33.0015Purpose
62B-33.002Definitions
62B-33.004Exemptions from Permit Requirements
62B-33.0041Field Permits
62B-33.0042Areawide Permits
62B-33.0043Individual Permits
62B-33.0044General Permits
62B-33.005General Criteria
62B-33.008Permit Application Requirements and Procedures
62B-33.0081Survey Requirements
62B-33.0082Processing Procedures for Areawide and Individual Permit Applications
62B-33.0083Processing Procedures for General Permit Applications
62B-33.0085Permit Fees
62B-33.0086Electronic Submittals
62B-33.013Permit Modifications, Time Extensions, and Renewals
62B-33.014Emergency Procedures
62B-33.0155General Permit Conditions
62B-33.024Thirty-Year Erosion Projection Procedures
62B-33.030General Permit for Dune Restoration
62B-33.031General Permit for Minor Structures
62B-33.032General Permit for Non-Habitable Major Structures Including Single-Family Dwelling Swimming Pools
62B-33.033General Permit for Single-Family Dwellings
62B-33.034General Permit Alternative Siting Criteria for Non-Habitable Major Structures, Swimming Pools and Single-Family Dwellings
62B-33.035General Permit for Maintenance of Existing Coastal Armoring Structures
62B-33.086Electronic Submittals
62B-33.900Forms
PURPOSE AND EFFECT: The Department of Environmental Protection proposes amendments to Chapter 62B-33, F.A.C., Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line (CCCL) and 50-Foot Setback). The proposed amendments will clarify and update existing rule language to reflect current procedures for exemptions, marine turtle protection and vegetation maintenance criteria, siting criteria, survey requirements, thirty year erosion projections, permit time limits and extensions, general conditions, definitions, forms, and fees. The Department is also proposing to update and add new general permits for activities seaward of the CCCL. In addition to amendments to the rule chapter, the Department proposes the creation of a CCCL Applicant’s Handbook.
SUBJECT AREA TO BE ADDRESSED: Proposed amendments to Chapter 62B-33, F.A.C., and creation of the CCCL Applicant’s Handbook which contain the rules and procedures for obtaining a permit for coastal construction and excavation seaward of the coastal construction control line or 50 foot setback.
RULEMAKING AUTHORITY: 161.052, 161.053, 161.0535, 161.085 FS.
LAW IMPLEMENTED: 161.052, 161.053, 161.0535, 161.054, 161.061, 161.085 FS.
A RULE DEVELOPMENT WORKSHOP WILL BE HELD AT THE DATE, TIME AND PLACE SHOWN BELOW:
DATE AND TIME: June 23, 2014, 1:30 p.m.
PLACE: The Florida Department of Environmental Protection, 2600 Blairstone Road, Tallahassee, Florida, Room 609. A live Webinar is also available; webinar participants may login at https://www2.gotomeeting.com/pjoin/824293266/105455517. To hear the audio, webinar participants also need to dial 888-670-3525; Access Code: 5907692993#.
Pursuant to the provisions of the Americans with Disabilities Act, any person requiring special accommodations to participate in this workshop/meeting is asked to advise the agency at least 5 days before the workshop/meeting by contacting: Bureau of Human Resource Management at (850)245-2511. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).
THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE DEVELOPMENT AND A COPY OF THE PRELIMINARY DRAFT, IF AVAILABLE, IS: Sandra Powell, (850)245-8604 or Sandra.powell@dep.state.fl.us. A copy of the draft amendments, the CCCL Applicant’s Handbook, and the agenda may be obtained by visiting www.dep.state.fl.us/beaches/rule-dev.htm
THE PRELIMINARY TEXT OF THE PROPOSED RULE DEVELOPMENT IS AVAILABLE AT NO CHARGE FROM THE CONTACT PERSON LISTED ABOVE.
Document Information
- Subject:
- Proposed amendments to Chapter 62B-33, F.A.C., and creation of the CCCL Applicant’s Handbook which contain the rules and procedures for obtaining a permit for coastal construction and excavation seaward of the coastal construction control line or 50 foot setback.
- Purpose:
- The Department of Environmental Protection proposes amendments to Chapter 62B-33, F.A.C., Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line (CCCL) and 50-Foot Setback). The proposed amendments will clarify and update existing rule language to reflect current procedures for exemptions, marine turtle protection and vegetation maintenance criteria, siting criteria, survey requirements, thirty year erosion ...
- Rulemaking Authority:
- 161.052, 161.053, 161.0535, 161.085
- Law:
- 161.052, 161.053, 161.0535, 161.054, 161.061, 161.085
- Contact:
- Sandra Powell, (850) 245-8604, or Sandra.powell@dep.state.fl.us. A copy of the draft amendments, the CCCL Applicant’s Handbook, and the agenda may be obtained by visiting www.dep.state.fl.us/beaches/rule-dev.htm.
- Related Rules: (15)
- 62B-33.0015. Purpose
- 62B-33.002. Definitions
- 62B-33.004. Exemptions from Permit Requirements
- 62B-33.0041. Field Permits
- 62B-33.0042. Areawide Permits
- More ...