  • 1(1) Any person desiring to obtain a permit from the Department shall apply on forms prescribed by the Department and shall submit such additional information as the Department by law may require.

    33(2) All applications and supporting documents shall be filed with the Department.

    45(3) To ensure protection of public health, safety, and welfare, any construction, modification, or operation of an installation which may be a source of pollution, or of a public drinking water supply, shall be in accordance with sound professional engineering practices pursuant to Chapter 471, F.S.; and all final geological papers or documents involving the practice of the profession of geology shall be in accordance with sound professional geological practices pursuant to Chapter 492, F.S. All applications for a Department permit shall be certified by a professional engineer registered in the State of Florida except, when the application is for renewal of an air pollution operation permit at a non-Title V source as defined in Rule 16162-210.200, 162F.A.C., or where professional engineering is not required by Chapter 471, F.S. Where required by Chapter 471 or 492, F.S., applicable portions of permit applications and supporting documents which are submitted to the Department for public record shall be signed and sealed by the professional(s) who prepared or approved them.

    212(4) Processing fees are as follows:

    218(a) Air Pollution Permits.

    2221. Construction Permit Fee for an Emissions Unit Requiring Prevention of Significant Deterioration or Nonattainment Area Preconstruction Review. The processing fee for a construction permit for an emissions unit requiring a Prevention of Significant Deterioration (PSD) or Nonattainment Area (NAA) preconstruction review pursuant to Rule 26762-212.400 268or 26962-212.500, 270F.A.C., respectively, shall be $7500.

    2752. Construction Permit Fee for an Emissions Unit Not Requiring Prevention of Significant Deterioration or Nonattainment Area Preconstruction Review. No processing fee shall be required for a construction permit for an emissions unit not requiring Prevention of Significant Deterioration (PSD) or Nonattainment Area (NAA) preconstruction review, if the facility containing the emissions unit holds an air operation permit issued pursuant to Chapter 62-213, F.A.C. For any such emissions unit at a facility not holding a Chapter 62-213, F.A.C., air operation permit, the processing fee shall be as follows:

    363a. Construction permit for an emissions unit having potential emissions of 100 or more tons per

    379year of any single pollutant

     

    384$5000

    385b. Construction permit for an emissions unit having potential emissions of 50 or more tons

    400per year, but less than 100 tons per year, of any single pollutant

     

    413$4500

    414c. Construction permit for an emissions unit having potential emissions of 25 or more tons per year,

    431but less than 50 tons per year, of any single pollutant

     

    442$2000

    443d. Construction permit for an emissions unit having potential emissions of 5 or more tons per year,

    460but less than 25 tons per year, of any single pollutant

     

    471$1000

    472e. Construction permit for an emissions unit having potential emissions of less than 5 tons per year of each pollutant

     

    492$250

    4933. Operation Permit Fee for an Emissions Unit at a Non-Title V Source.

     

    506a. Operation permit for an emissions unit required to measure actual emissions by stack sampling

    521$1500

    522b. Operation permit for an emissions unit required to measure actual emissions by any method

    537other than stack sampling (such as visible emissions observation or continuous emissions monitoring)

    550$1000

    551c. Operation permit for an emissions unit not required to measure actual emissions

    564$750

    5654. Similar Emissions Unit Fee. Where new or existing multiple emissions units located at the same facility are substantially similar in nature, the applicant may submit a single application and any required permit fee for construction or operation of the emissions units at the facility. To be considered substantially similar each of the emissions units must be substantially similar in regard to each of the following: nominal description or type of emissions unit; type of fuel burned; type of material processed, stored, or handled; type of air pollution control equipment; regulated pollutants emitted; applicable emissions standards; and applicable regulatory control criteria. For a construction permit, the single application fee shall be the fee that would apply for a single emissions unit with emissions that equal the total of the potential emissions of all of the substantially similar emissions units at the facility. The fee for an operation permit for a group of similar emissions units at the same facility, submitted under the same application and with the same emissions testing or monitoring requirements, shall be the fee that would apply to any emissions unit in the group if each emissions unit were being permitted singly.

    7605. Multiple Emissions Unit Fee. If the Department issues a single construction or operation permit covering multiple emissions units or groups of similar emissions units at a facility, the permit processing fee shall be the sum of the fees applicable to each emissions unit and group of similar emissions units covered by the permit.

    814(b) Domestic Wastewater Facility Permits.

    8191. Preliminary Design Report reviews for Types I, II, and III domestic wastewater facilities as defined in Rule 83762-600.200, 838F.A.C. For new domestic wastewater facilities, the fee for review of a preliminary design report shall be in addition to the application processing fee.

     

    862Type I

    864Type II

    866Type III

    868a. Treatment plant with or without reuse/disposal system

    876$5000

    877$3750

    878$1200

    879b. Reuse/land application system and associated transmission/distribution facilities, when applied for separately from the treatment facility

    895$5000

    896$3750

    897$1200

    898c. Residuals/septage management facility

    902$7500

    903$4000

    904$1200

    905d. Limited wet weather discharge

    910$1000

    911$800

    912$600

    9132. Wastewater permits for Types I, II, and III domestic wastewater facilities as defined in Rule 92962-600.200, 930F.A.C.

     

    931Type I

    933Type II

    935Type III

    937a. Treatment plant with or without reuse/disposal system

    945$5000

    946$3000

    947$1000

    948b. Reuse/land application system and associated transmission/distribution facilities, when applied for separately from the treatment facility

    964$5000

    965$3000

    966$1000

    967c. Residuals/septage management facility

    971$7500

    972$4000

    973$1000

    974d. Limited wet weather discharge

    979$1000

    980$800

    981$600

    982e. Wastewater permits for Type III facilities having a permitted capacity of less than 10,000 gallons per day shall be $600.

    10043. Wastewater Permit for a surface water discharge, when applied for separately from the treatment facility.

    1020a. Type I facility

    1024$2000

    1025b. Type II facility

    1029$1000

    1030c. Type III facility

    1034$500

    10354. Minor revisions, as defined in Rule 104262-620.200, 1043F.A.C., to wastewater permits for domestic wastewater facilities other than minor modifications of permits listed in paragraph 106062-4.050(4)(s), 1061F.A.C.

    1062a. Type I facility

    1066$500

    1067b. Type II facility

    1071$300

    1072c. Type III facility

    1076$100

    10775. Substantial revisions, as defined in Rule 108462-620.200, 1085F.A.C., to wastewater permits for domestic wastewater facilities shall require a new wastewater permit application and applicable fee. The applicable application fee shall be:

    1109a. For substantial revisions resulting from substantial modifications to the facility which require an antidegradation determination as specified in Rule 112962-4.242, 1130F.A.C., or which increase the permitted capacity of the treatment, reuse, or disposal system, the preliminary design report fee specified in subparagraph (4)(b)1.

    1153b. For substantial revisions resulting from substantial modifications to the facility, but which do not require an antidegradation determination as specified in Rule 117662-4.242, 1177F.A.C., and which do not increase the permitted capacity of the treatment, reuse, or disposal system, 50 percent of the preliminary design report fee specified in subparagraph (4)(b)1.

    1205c. For substantial revisions not associated with substantial modifications to the facility, 20 percent of the applicable application fee specified in subparagraph (4)(b)2.

    12286. Generic Permit for domestic wastewater treatment facilities.

    1236a. Treatment facility with permitted capacity of 10,000 gallons per day up to 100,000 gallons per day shall be              1257$1,000

    1259b. Treatment facility with permitted capacity less than 10,000 gallons per day shall be                                             1274$600

    12757. Construction Permit for domestic wastewater collection/transmission system.

    1283a. Domestic wastewater collection/transmission system serving 10 or more

    1292$500

    1293Equivalent Dwelling Units (EDUs). An EDU is equal to 3.5 persons

     

    1304b. Domestic wastewater collection/transmission system serving less than 10 EDUs

    1314$300

    1315(c) Industrial Wastewater Facility Permits.

    13201. Wastewater permits for Group 1 industrial wastewater treatment facilities which discharge process wastewater, as defined in Rule 133862-620.200, 1339F.A.C., from the following industry categories: Citrus Processing; Textiles; Organic Chemicals, Plastics, and Synthetic Fibers; Inorganic Chemicals; Soaps and Detergents; Fertilizer Manufacturing; Petroleum Refining; Iron and Steel Manufacturing; Nonferrous Metals; Phosphate Manufacturing; Steam Electric Power Generating; Asbestos Manufacturing; Pulp, Paper, and Paper Board; Builders Paper and Board Mills; Coal Mining; Phosphate Mining and Beneficiation; Ore Mining and Dressing; Paint Formulating; Ink Formulating; Gum and Wood Chemicals Manufacturing; Pesticides Chemicals Manufacturing; Explosives Manufacturing; Battery Manufacturing; Mechanized Scallop Processing; Distilled, Rectified, and Blended Liquors; Sugar Cane Processing.

    1424a. Surface water discharges

    1428$7500

    1429b. Non-surface water discharges only

    1434$6000

    14352. Wastewater permits for Group 2 industrial wastewater treatment facilities which discharge process wastewater, as defined in Rule 145362-620.200, 1454F.A.C., from the following industry categories: Cement Manufacturing; Leather Tanning and Finishing; Glass Manufacturing; Rubber Processing; Carbon Black Manufacturing; Metal Molding and Casting; Coil Coating; Porcelain Enameling; Aluminum Forming; Copper Forming; Electrical and Electronic Components; Nonferrous Metals Forming and Metal Powders.

    1495a. Surface water discharges

    1499$5000

    1500b. Non-surface water discharges only

    1505$4000

    15063. Wastewater permits for Group 3 industrial wastewater treatment facilities which discharge process wastewater, as defined in Rule 152462-620.200, 1525F.A.C., from the following industry categories: Bulk Oil Terminals, Drawdown and Loading Rack Discharges; Dairy Products; Canned and Preserved Fruits and Vegetables; Canned and Preserved Seafood; Concrete Batch Plants; Timber Products; Mineral Mining and Processing; Peat Mining; Plastic Molding and Forming; Aquaculture Facilities.

    1568a. Surface water discharges

    1572$2500

    1573b. Non-surface water discharges only

    15784. Wastewater permits for Group 4 industrial wastewater treatment facilities which discharge industrial wastewater from the following: Animal Feeding Operations, Feedlots, Egg Production Facilities.

    1602$2000

    1603a. Feedlots with greater than the number of animals listed in subsection 161562-670.200(3) 1616or

     

    1617Rule 62-620.435, F.A.C.

    1620$2500

    1621b. Feedlots, Other

    1624$1500

    1625c. Egg Production Facility, Major

    1630$2500

    1631d. Egg Production Facility, Other

    1636$1500

    16375. Wastewater permits for Group 5 industrial wastewater treatment facilities which discharge concentrate

    1650and regenerant from Reverse Osmosis, Membrane Softening, Ultrafiltration, Ion Exchange Units, and

    1662similar processes at Drinking Water Treatment Facilities.

    1669a. Design daily discharge flow of greater than 500,000 gpd

     

    1680$6000

    1681b. Design daily discharge flow of greater than 100,000 gpd up to 500,000 gpd

    1697$4000

    1698c. Design daily discharge flow of greater than 10,000 gpd up to 100,000 gpd

    1714$2000

    1715d. Design daily discharge flow of 10,000 gpd or less

    1726$750

    17276. Wastewater permits for Group 6 industrial wastewater treatment facilities which discharge once-through non-contact cooling water.

    1743a. Greater than 100 million BTU/hour heat loss

    1751$6000

    1752b. Greater than 20 million BTU/hour, up to 100 million BTU/hour

    1763$3000

    1764c. Greater than 1 million BTU/hour, up to 20 million BTU/hour heat loss

    1777$1500

    1778d. 1 million BTU/hour, or less, heat loss

    1786$500

    17877. Wastewater permits for industrial wastewater treatment facilities in industry categories not specified in Groups 1 through 3 which discharge process wastewater to surface waters, or industrial wastewater treatment facilities which discharge non-process wastewater, as defined in Rule 182562-620.200, 1826F.A.C., but excluding once-through non-contact cooling water, to surface waters.

    1836a. Design daily flow of greater than 500,000 gpd

    1846$5000

    1847b. Design daily flow of greater than 100,000 gpd up to 500,000 gpd

    1862$3000

    1863c. Design daily flow of greater than 50,000 gpd up to 100,000 gpd

    1878$2000

    1879d. Design daily flow of 50,000 gpd or less

    1889$1000

    18908. Wastewater permits for industrial wastewater treatment facilities in industry categories not specified in Groups 1 through 3 which discharge process wastewater to other than surface waters, or industrial wastewater treatment facilities which discharge non-process wastewater, as defined in Rule 193062-620.200, 1931F.A.C., but excluding once-through non-contact cooling water, to other than surface waters.

    1943a. Design daily flow of greater than 500,000 gpd

    1953$4000

    1954b. Design daily flow of greater than 100,000 gpd up to 500,000 gpd

    1969$2500

    1970c. Design daily flow of greater than 50,000 gpd up to 100,000 gpd

    1985$1500

    1986d. Design daily flow of 50,000 gpd or less

    1996$750

    19979. Wastewater permits for industrial wastewater treatment facilities which recycle the wastewater and have no discharge to surface or ground waters, and are not otherwise exempt from permitting.

    2025a. Facilities recycling greater than 10,000 gpd

    2033$500

    2034b. Facilities recycling 10,000 gpd or less

    2042$100

    204310. Minor revisions, as defined in subsection 205062-620.200(24), 2051F.A.C., to wastewater permits for industrial wastewater facilities other than minor modifications of permits listed in paragraph 206862-4.050(4)(q), 2069F.A.C.

    2070a. Facilities which have no discharge to surface or ground waters

    2081$100

    2082b. All others

    2085$250

    208611. Substantial revisions, as defined in subsection 209362-620.200(45), 2094F.A.C., to wastewater permits for existing industrial wastewater facilities shall require a new wastewater permit application and applicable fee. The applicable fee shall be:

    2118a. For substantial revisions resulting from substantial modifications to the facility which require an antidegradation determination as specified in Rule 213862-4.242, 2139F.A.C., or which increase the permitted capacity of the treatment or disposal system, the full applicable application fee.

    2157b. For substantial revisions resulting from substantial modifications to the facility, but which do not require an antidegradation determination as specified in Rule 218062-4.242, 2181F.A.C., and which do not increase the permitted capacity of the treatment or disposal system, 50 percent of the applicable application fee.

    2203c. For substantial revisions not associated with substantial modifications to the facility, 20 percent of the applicable application fee or $250, whichever is greater.

    222712. The fee for review of engineering reports for new industrial facilities shall be in the same amount as the applicable application processing fee for the facility and shall be in addition to the application processing fee.

    226413. Industrial wastewater general and generic permits.

     

    2271a. General and generic permits requiring Professional Engineer or Professional Geologist certification

    2283$500

    2284b. General and generic permits not requiring Professional Engineer or Professional Geologist certification

    2297$100

    229814. Collection systems for industrial wastewater treatment facilities.

    2306$500

    230715. A permitted facility which falls in more than one of the fee categories in subparagraphs (4)(c)1. through 8. shall not be subject to multiple fees, but shall pay the larger of the fees.

    2341(d) Stormwater facilities or activities regulated under Section 2349403.0885, F.S.

     

    23511. Generic Permit for Stormwater Discharge from Large and Small Construction Activities.

     

    2363a. Activities disturbing 5 or more acres (large)

    2371$400

    2372b. Activities disturbing 1 acre of land or greater and less than 5 acres (small)

    2387$250

    23882. Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity

    2399$500

    24003. No Exposure Certification for Exclusion from NPDES Stormwater Permitting

    2410$200

    24114. Stormwater discharge associated with industrial activity permitted under Chapter 62-620, F.A.C.

    2423$1,000

    24255. Generic Permit for Discharge of Stormwater from Phase II Municipal Separate Storm Sewer Systems (MS4s):

     

    2441a. Phase II MS4s in jurisdiction with a population of 50,000 or greater as determined by the 2000 Decennial Census by the U.S. Bureau of Census

    2468$11,700

    2470b. Phase II MS4s in a jurisdiction with a population of greater than 10,000 but less than 50,000 as determined by the 2000 Decennial Census by the U.S. Bureau of Census

    2503$7,988

    2505c. Phase II MS4s in a jurisdiction with a population of 10,000 or less as determined by the 2000 Decennial Census by the U.S. Bureau of Census; Florida Department of Transportation facilities

    2538$5,625

    2540(e) Wetland Resource Management (Dredge and Fill) Permits. This paragraph pertains to projects that have been grandfathered according to Sections 2560373.414(11) 2561(1994 Supp.), (12)(a) (1994 Supp.), (13), (14), (15) or (16), F.S., and projects, or portions thereof, located in the Northwest Florida Water Management District.

    25851. Dredge and fill construction projects up to and including 5 years:

     

    2597a. Standard form projects including dredge and fill activities that affect 10 or

    2610$4,000

    2612more acres of jurisdictional area pursuant to subsection 262062-312.070(2), 2621F.A.C.

     

    2622b. Standard form construction projects that involve the construction of new docking

     

    2634facilities pursuant to Rule 263862-312.070, 2639F.A.C., that provide:

     

    2642(I) 50 or more new boat slips

    2649$4,000

    2651(II) 25 to 49 new boat slips

    2658$4,000

    2660(III) 10 to 24 new boat slips

    2667$2,480

    2669(IV) 3 to 9 new boat slips

    2676$830

    2677(V) 0 to 2 new boat slips

    2684$500

    2685c. Short form construction projects involving dredging or filling of 9.99 acres or less of jurisdictional

    2701area, pursuant to subsection 270562-312.070(2), 2706F.A.C.

     

    2707$830

    2708d. Short form construction projects involving the construction of new docking or boardwalk facilities,

    2722pursuant to Rule 272562-312.070, 2726F.A.C., that provide:

    2729(I) 0 to 2 new boat slips

    2736$500

    2737(II) 3 to 9 new boat slips

    2744$830

    2745(III) The addition of 3 to 20 docking slips to existing functional docking facilities where the total facility
    2763will not exceed 50 slips and the existing and proposed slips are not associated with commercial facilities or
    2781facilities which provide supplies or services required for boating activities.

            2791$760

    2792e. Short form and standard form projects solely for environmental restoration or enhancement activities,
    2806provided such activities are not associated with a mitigation bank and are not being implemented as
    2822mitigation for other activities that require a permit under Part IV of Chapter 373, F.S.

    2837$250

    28382. Dredge and fill construction permits in excess of 5 years:

     

    2849a. Short form permits from 6 years up to and including 10 years

    2862$4,950

    2864b. Standard form permits for 6 years

    2871$10,650

    2873c. Standard form permits for 7 years

    2880$12,430

    2882d. Standard form permits for 8 years

    2889$14,200

    2891e. Standard form permits for 9 years

    2898$15,980

    2900f. Standard form permits for 10 years

    2907$17,750

    2909g. Standard form permits for 11 years

    2916$19,530

    2918h. Standard form permits for 12 years

    2925$21,300

    2927i. Standard form permits for 13 years

    2934$23,080

    2936j. Standard form permits for 14 years

    2943$24,850

    2945k. Standard form permits for 15 years

    2952$25,000

    2954l. Standard form permits for 16 years

    2961$25,000

    2963m. Standard form permits for 17 years

    2970$25,000

    2972n. Standard form permits for 18 years

    2979$25,000

    2981o. Standard form permits for 19 years

    2988$25,000

    2990p. Standard form permits for 20 years

    2997$25,000

    2999q. Standard form permits for 21 years

    3006$25,000

    3008r. Standard form permits for 22 years

    3015$25,000

    3017s. Standard form permits for 23 years

    3024$25,000

    3026t. Standard form permits for 24 years

    3033$25,000

    3035u. Standard form permits for 25 years

    3042$25,000

    3044v. 6 to 10-year permits for beach restoration projects approved pursuant to Chapter 161, F.S., and to
    3061maintenance dredge navigation channels, port harbors, turning basins and harbor berths located within
    3074deepwater ports, pursuant to Section 3079403.816, F.S.

    3081$5,000

    3083w. Permits for phosphate and attapulgite mines with a duration of greater than 25 years pursuant to the provisions of Section 3104373.414(15), F.S.

    3106$25,000

    3108x. Modifications involving permits issued pursuant to Section 3116403.816, F.S., 3118or Chapter 62-45, F.A.C.

    3122$1,000

    3124y. 6 to 25-year permits pursuant to Chapter 62-45, F.A.C., and all permits under Section 3139403.816, F.S.

    3141$5,000

    3143z. Short form and standard form projects solely for environmental restoration or enhancement activities,
    3157provided such activities are not associated with a mitigation bank and are not being implemented as mitigation
    3174for other activities that require a permit under Part IV of Chapter 373, F.S.

     

            3188$250

    31893. Mitigation Banks

    3192a. Mitigation Bank Permit, other than Conceptual Approval Permit

     

    3201$6,050

    3203b. Credit Release (credit available for sale)

    3210$330

    3211c. Credit Withdrawal (actual use of credit)

    3218$0

    3219d. Mitigation Bank Conceptual Approval Permit

    3225$6,050

    3227e. Major 3229modifications involving changes to one or more of the following components: service area; credit assessment; success or release criteria; hydrologic structures or alterations; construction or mitigation design that does not increase the project area; elimination of lands; or monitoring or management plans:

     

    3271(I) Affecting one of the above components

    3278$1,340

    3280(II) Affecting two of the above components

    3287$2,680

    3289(III) Affecting three of the above components

    3296$4,020

    32984. Modifications:

     

    3300a. Major modifications of Standard Form and Short Form Permits, as determined by Rule 331462-312.100, 3315F.A.C., and mitigation banks under Chapter 62-342, F.A.C., 3323that increase the project area or involve four or more of the components listed in sub-subparagraph 333962-4.050(4)(e)3.e., 3340F.A.C., 3341other than for Class I solid waste disposal facilities or as otherwise specified above

    3355Same fee as

    3358for a new

    3361application

    3362for the

    3364activity

    3365b. Minor modifications of Standard Form and Short Form Permits, including mitigation banks, where the modification will not require substantial technical evaluation by the Department, will not lead to substantially different environmental impacts or will lessen the impacts of the original permit, and as further determined by Rule 341362-312.100, 3414F.A.C., other than for Class I solid waste disposal facilities or as otherwise specified above:

     

    3429(I) To correct minor errors or typographical mistakes and that do not involve technical review

    3444$0

    3445(II) To incorporate changes requested by the Department or required through permits issued by other regulatory agencies, and to change due dates for reporting or performance deadlines when such changes in the due date do not involve any new work, any new work locations, or any new activities, and will not alter, replace, or otherwise eliminate the requirements for otherwise performing the work required by the permit

     

     

    3512$0

    3513(III) That consist of transfers of permits or time extensions

    3523$80

    3524(IV) That consist of minor technical changes which involve new work, new work locations, new activities, or any other change which alters, replaces, or otherwise eliminates the work authorized by the permit when the original permit fee of the issued permit is less than $300, except for modifications to permits issued pursuant to Section 3578403.816, F.S.

     

     

    3580$250

    3581(V) That consist of minor technical changes which involve new work, new work locations, new activities, or any other change which alters, replaces, or otherwise eliminates the work authorized by the permit when the original permit fee of the issued permit is more than or equal to $300, except for permits issued pursuant to Section 3636403.816, F.S.

     

     

    3638$420

    3639(VI) For minor modifications for Class I solid waste disposal facilities

    3650$2,110

    36525. For the purposes of determining the fee for wetlands resource management permits, the term of duration for the permit shall be reduced by the period of time (in yearly increments) during which no dredging or filling activity occurs or no reclamation, restoration, or mitigation occurs and only minor monitoring and maintenance activities are required. The fee for the full term shall be submitted with the application. After the Department determines the period of time that the term of the permit can be reduced, the excess fee shall be returned.

    37426. For permit applications which involve a combination of the project fee categories listed above, the highest fee that applies to the appropriate standard form or short form project, pursuant to Rule 377462-312.070, 3775F.A.C., shall be charged.

    37797. Variances from permitting standards, permit conditions, or water quality standards associated with a wetland resource or mangrove alteration permit application:

     

    3800a. Under Section 3803403.812, F.S.

    3805(I) From the prohibition of subsection 381162-312.080(7), 3812F.A.C.

     

    3813$170

    3814(II) Other variances

    3817$830

    3818b. Under Section 3821120.542, F.S.

    3823$0

    38248. Verification of qualification to use a general permit, except:

    3834$250

    3835a. Paving of existing municipally owned roads under Rule 384462-312.824, 3845F.A.C.

    3846$0

    3847b. Environmental enhancement and restoration activities conducted by the U.S. Army Corps of Engineers under Rule 386362-312.825, 3864F.A.C.

    3865$0

    38669. Verification that an activity is exempt from regulation under Section 3877403.813, F.S., 3879or Part IV of Chapter 373, F.S.

    3886$100

    3887(f) Mangrove Alteration and Trimming

     

    38921. Alteration of less than 20 mangroves under Section 3901403.9328, F.S.

    3903$420

    39042. Alteration of 20 or more mangroves under Section 3913403.9328, F.S.

    3915$830

    39163. General Permit under Section 3921403.9327, F.S.

    3923$250

    39244. Verification of an exemption for trimming or alteration

    3933$0

    39345. Minor modification, other than transfer & time extensions

    3943$250

    39446. Transfer of ownership or permit

    3950$90

    39517. Time extension

    3954$90

    39558. Variance under Section 3959403.9333, F.S.

    3961$170

    3962(g) Stormwater Permits under Chapter 62-25, F.A.C.

     

    39691. Notice to use stormwater general permit per paragraphs 397862-25.801(1)(a) 3979through (d), F.A.C.

    3982$420

    39832. Conversion of construction permit to operation

    3990$100

    3991(h) Environmental Resource Permits. 3995Processing fees required by the Department and the Northwest Florida Water Management District (NWFWMD) for activities regulated under Chapter 62-330, F.A.C., are listed below. For purposes of determining the applicable processing fee, the terms “activity,” “project,” “project area,” and “works” are as defined in Section 2.0 of the Applicant’s Handbook Volume I incorporated by reference in paragraph 405562-330.010(4)(a), 4056F.A.C.

    40571. Activities qualifying for an Agency’s electronic self-certification:

     

    4065a. Self-certification in accordance with the general permit under Section 4075403.814(12), F.S.

    4077$0

    4078b. Self-certification for activities other than those under Section 4087403.814(12), F.S.

    4089$0

    40902. Determination of qualification for an activity exemption

     

    4098a. Under Rules 410162-330.050 4102and 410362-330.051, 4104F.A.C.

    4105$100

    4106b. Under Rule 410962-330.0511, 4110F.A.C.

    4111$0

    41123. Determination of qualification to use a general permit

    4121$250

    41224. Individual or conceptual approval permit, excluding permits for a mitigation bank:

     

    4134a. New application – the processing fee for a new permit application shall be as determined from the categories below:

     

    4154(I) Total project area of less than 10 acres and less than 1 acre of works in, on, or over wetlands and other surface waters, and less than 10 new boat slips

     

    4186$420

    4187(II) Project exceeds any of the thresholds in 4.a.(I), above, but involves a total project area of less than 40 acres, less than 3 acres of works in, on, or over wetlands and other surface waters, and less than 30 new boat slips

     

    4230$1,500

    4232(III) Project exceeds any of the thresholds in 4.a.(II), above, but involves a total project area of less than 100 acres, less than 10 acres of works in, on, or over wetlands and other surface waters, and less than 50 new boat slips

     

    4275$5,000

    4277(IV) Project exceeds any of the thresholds in 4.a.(III), above, but involves a total project area of less than 640 acres, and less than 50 acres of works in, on, or over wetlands and other surface waters

     

    4314$9,000

    4316(V) Project exceeds any of the thresholds in 4.a.(IV), above

    4326$14,000

    4328(VI) Project exclusively for agricultural or silvicultural purposes; the fee for projects that are solely for agricultural or silvicultural purposes shall be the same as that required by the Water Management District in which the majority of the project area is located, in accordance with Rule 437440A-44.201, 4375F.A.C, (7-1-98) incorporated by reference herein (4382http://www.flrules.org/Gateway/reference.asp?No=Ref-026804384); and Rules 438740B-1.706, 438840C-1.603, 438940D-1.607, 4390or 439140E-1.607, 4392F.A.C., as applicable, as incorporated by reference in Rule 440162-330.071, 4402F.A.C.

    4403The fee shall be the

    4408same as that required

    4412by the Water

    4415Management District

    4417in which the

    4420majority of the

    4423project area is

    4426located.

    4427(VII) Individual or conceptual approval permit solely for environmental restoration or enhancement, provided such activities are not associated with a mitigation bank and are not being implemented as mitigation for other activities that require a permit under Part IV of Chapter 373, F.S. For purposes of this provision, the term “environmental restoration or enhancement” means an action or actions designed and implemented solely to convert degraded or altered uplands, wetlands, or other surface waters to intact communities typical of those historically present, or to improve the quality and condition of currently degraded wetlands or other surface waters to a more healthy, functional, and sustaining condition for fish, wildlife, and listed species

     

     

     

     

    4538$250

    4539(VIII) Individual or conceptual approval permit solely to retrofit an existing stormwater management system or to add treatment to and reduce stormwater pollutant loadings from an existing stormwater management system

     

    4569$250

    4570(IX) Individual permit to construct, alter, maintain or operate a project that is consistent with a valid conceptual approval permit

    459050% of the fee otherwise required for an individual permit under 4.a.(I) through (VIII), above, but not below the minimum required processing fee of $250

    4615b. M4617ajor modification exceeding any of the thresholds in subsection 462662-330.315(3), 4627F.A.C.

    4628Same fee as for new permit for the same activity under 4.a.(I) through (IX), above

    46435. Individual or conceptual approval permit for a mitigation bank:

     

    4653a. New application

    4656$6,050

    4658b. Major modification exceeding any of the thresholds in subsection 466862-330.315(3), 4669F.A.C.:

     

    4670(I) Major modification affecting one of the following: the service area, credit assessment, success or release criteria, hydrologic structures or alterations, elimination of lands, monitoring or management plans, or construction or mitigation design that does not increase the project area

     

    4710$1,340

    4712(II) Affecting two of the components in 5.b.(I), above

    4721$2,680

    4723(III) Affecting three of the components in 5.b.(I), above

    4732$4,020

    4734(IV) All other major modifications

    4739$6,050

    4741c. Mitigation bank credit release

    4746$330

    4747d. Mitigation bank credit withdrawal

    4752$0

    47536. Minor modification of an individual or conceptual approval permit, including a permit for a mitigation bank, that does not exceed any of the thresholds in subsection 478062-330.315(3), 4781F.A.C.:

     

    4782a. Extension of permit duration, where not exempt from payment of fees under Florida Statutes

    4797$80

    4798b. To correct minor errors that do not involve technical review

    4809$0

    4810c. To transfer ownership of a permit or to transfer the permit to an operation and maintenance entity

     

    4828$0

    4829d. All other minor modifications

    4834$250

    48357. Variance or waiver:

     

    4839a. Under Section 4842120.542, F.S.

    4844$0

    4845b. Under Section 4848373.414(17), F.S.

    4850$170

    48518. Fee reductions:

     

    4854a. Applications for an individual or conceptual approval permit or modification thereof submitted using the Agency’s electronic application system where the processing fee in subparagraph (h)4. or 5., above exceeds $250

    4885Fee shall be reduced by $100, but not below the minimum required processing fee of $250

    4901b. Applications for any activity by an entity qualifying under Section 4912218.075, F.S. 4914when the fee under paragraph (h) exceeds $100

     

    4922$100

    4923c. Applications for any activity when submitted by the U.S. Department of Defense

    4936$0

    4937(i) Determinations of the Landward Extent of Wetlands and Other Surface Waters:

     

    49491. Informal determination 4952‒ fees shall be based on the acreage of the entire property for which the request applies, as follows:

     

    4971a. Total area to be included in the determination is up to 1 acre

    4985$100

    4986b. Additional fee per acre (or portion thereof) beyond the first acre; total fe5000e not to exceed $500

    5005$50

    50062. Petitions for formal determination ‒ fees shall be based on the acreage of the entire property for which the petition is filed, as follows:

     

    5031a. Total area to be included in the determination is less than 10 acres

    5045$780

    5046b. Tot5048al area to be included in the determination is at least 10, but less than 40 acres

    5065$1,060

    5067c. Total area to be included in the determination is at least 40, but no more than 100 acres

    5086$2,110

    5088d. Additional fee per 100 acres (or portion thereof) beyond the first 100 acres

    5102$290

    51033. Reissuance of a formal determination, in accordance with section 7.2.4 of Applicant’s Handbook Volume I.

    5119$350

    5120(j) Solid Waste Permits.

     

    51241. Construction permit for a Class I facility.

    5132$10,000

    51342. Construction permit for a Class II facility.

    5142$10,000

    51443. Construction permit for a Class III facility.

    5152$6000

    51534. Construction permit for a waste-to-energy facility not covered by the Electric Power Plant Siting Act.

    5169$10,000

    51715. Construction permit for other resource recovery facilities.

    5179$2000

    51806. Construction permit for an incinerator.

    5186$3000

    51877. Construction permit for a yard trash composting facility.

    5196$2000

    51978. Construction permit for a manure composting facility.

    5205$2000

    52069. Construction permit for a solid waste composting facility.

    5215$5000

    521610. Construction/operation permit for a waste tire processing facility.

    5225$1250

    522611. Construction permit for all other solid waste facilities.

    5235$1000

    523612. Construction permit for an offsite Biohazardous Waste Treatment

    5245$2000

    5246Facility other than a biohazardous waste incinerator.

     

    525313. Construction permit and/or an operation permit for a facility which has multiple solid waste management components which normally would require individual solid waste permits. A single application may be submitted and the permit fee will be the sum of each individual permit; however, the total permit fees for the facility shall not exceed $25,000, exclusive of modifications and renewals.

    531414. Operation permit for a Class I facility.

    5322$10,000

    532415. Operation permit for a Class II facility.

    5332$10,000

    533416. Operation permit for a Class III facility.

    5342$4000

    534317. Operation permit for a waste-to-energy facility not covered by the Electric Power Plant Siting Act.

     

    5359$10,000

    536118. Operation permit for other resource recovery facilities.

    5369$1000

    537019. Operation permit for an incinerator.

    5376$1000

    537720. Operation permit for a yard trash composting facility.

    5386$1000

    538721. Operation permit for a manure composting facility.

    5395$1000

    539622. Operation permit for a solid waste composting facility.

    5405$3000

    540623. Operation permit for an offsite Biohazardous Waste Treatment Facility other than a biohazardous waste incinerator.

     

    5422$1000

    542324. Operation permit for all other solid waste facilities.

    5432$500

    543325. Request for an Alternate Procedure.

     

    5439a. Landfill

    5441$2000

    5442b. Other

    5444$500

    544526. Research, Development and Demonstration permits (one year permit).

    5454$1000

    545527. Closure permit for a Class I facility.

    5463$7500

    546428. Closure permit for a Class II facility.

    5472$7500

    547329. Closure permit for a Class III facility.

    5481$4000

    548230. Closure permit for all other solid waste facilities.

    5491$1000

    549231. Renewal of Closure permit for landfills which address only long term care.

    5505$1000

    550632. Construction or Operation permits for Materials Recovery Facility.

    5515$2000

    551633. Ground Water Monitoring Plan Approvals for solid waste landfills with no other Department permit.

     

    5531$500

    5532(k) Petroleum Cleanup General Permits.

     

    55371. Soil thermal treatment – mobile.

    5543$500

    55442. Soil thermal treatment – stationary.

    5550$500

    5551(l) Hazardous Waste Permits.

     

    55551. Construction of container and/or tank hazardous waste storage facilities.

    5565$15,000

    55672. Construction of container and/or tank hazardous waste storage and treatment facilities.

    5579$20,000

    55813. Construction of landfill, surface impoundment, waste pile, land treatment, and miscellaneous unit facilities.

     

    5595$25,000

    55974. Construction of hazardous waste storage, treatment and/or disposal facilities with an incinerator, boiler or industrial furnace for treatment of hazardous wastes generated on-site.

     

    5621$25,000

    56235. Construction of commercial treatment, storage, and/or disposal facility with a commercial incinerator, boiler or industrial furnace managing hazardous wastes generated off-site.

     

    5645$32,500

    56476. Operation of container and/or tank hazardous waste storage facilities.

    5657$10,000

    56597. Operation of container and/or tank hazardous waste storage and treatment facilities.

    5671$10,000

    56738. Operation of landfill, surface impoundment, waste pile, land treatment, and miscellaneous unit facilities.

     

    5687$15,000

    56899. Operation of hazardous waste storage, treatment and/or disposal facilities with an incinerator, boiler or industrial furnace for treatment of hazardous wastes generated on-site.

     

    5713$15,000

    571510. Operation of commercial treatment, storage, and/or disposal facilities with a commercial incinerator, boiler or industrial furnace managing hazardous wastes generated off-site.

     

    5737$32,500

    573911. Closure of container and/or tank hazardous waste storage facilities.

    5749$10,000

    575112. Closure of container and/or tank hazardous waste storage and treatment facilities.

    5763$10,000

    576513. Closure of landfill, surface impoundment, waste pile, land treatment, previously closed

     

    5777units required to demonstrate equivalent clean closure, and miscellaneous unit facilities.

    5788$20,000

    579014. Closure of hazardous waste storage, treatment and/or disposal facilities with an incinerator, boiler or industrial furnace for treatment of hazardous wastes generated on-site.

     

    5814$15,000

    581615. Closure of commercial treatment, storage, and/or disposal facilities with a commercial incinerator, boiler or industrial furnace managing hazardous wastes generated off-site.

     

    5838$32,500

    584016. Hazardous waste research, development and demonstration facilities.

    5848$4000

    584917. Fees for modifications to hazardous waste permits proposed by the permittee or required by Department rules shall be determined as stated below. All modifications listed below require public notice. Contact the appropriate District Office for guidance on how to determine which fee applies before submitting the required information.

    5898a. Substantial modifications that require significant changes to the existing permit and require an extensive evaluation by the Department. These shall require the same fee as a new application. Examples in this category include alteration of the existing facility, change in the facility plan, ground water monitoring program assessment or remediation/engineering design or other general facility standard. The fee schedule for new permit applications is listed above.

    5965b. Substantial modifications that require a moderate technical evaluation by the Department. Examples in this category include alterations of the existing facility or its operation which will require additional site-specific evaluation.

     

    5996$10,000

    5998c. Moderate modifications that require moderate technical evaluation by the Department. These require a new site inspection, lead to different environmental impacts, or lessen the impacts of the original permit.

     

    6028$5,000

    6030d. Minor modifications, as defined in this subsection, that are not otherwise specified, including common or frequently occurring changes needed to maintain a facility’s capacity to manage wastes safely, minor changes in ground water monitoring plans, or modifications to conform to new requirements.

     

     

    6073$1,000

    607518. Department variance from federal regulations under 608240 CFR 260.30.

    6085$32,500

    608719. All other hazardous waste facility permits or authorizations for which a specific fee is not specified.

     

    6104$32,500

    6106(m) Underground Injection Control Permits.

     

    61111. Construction permit for each Class I test/injection well.

    6120$12,500

    61222. Construction permit for each Class I exploratory well.

    6131$5,000

    61333. Construction permit for each monitoring well associated with a Class I injection facility when not permitted under a Class I exploratory well or Class I test/injection well permit.

    6162$1,000

    6164per well not to exceed

    6169$10,000 for the facility

    61744. Permit to convert each well from a Class I to a Class V well.

    6189$10,000

    61915. Operation permit for each Class I well.

    6199$10,000

    62016. Permit to convert a Class I injection well or exploratory well to a monitoring well when not proposed under a construction permit.

     

    6224$500

    62257. Abandonment permit for each Class I well.

    6233$100

    62348. Construction permit for each Class III well.

    6242$1,000

    62449. Operation permit for each Class III well.

    6252$1,000

    625410. Abandonment permit for each Class III well.

    6262$100

    626311. Construction permit for each Class V well.

    6271$750

    627212. Operation permit for each Class V well.

    6280$750

    628113. Abandonment permit for each Class V well.

    6289$25

    629014. General permit for each Class V well.

     

    6298a. General permits requiring Professional Engineer or Professional Geologist certification

    6308$250

    6309b. General permits not requiring Professional Engineer or Professional Geologist certification

     

    6320$25

    632115. Major modifications are modifications to an injection facility requiring substantial technical evaluation by the Department, and which will not lead to substantially different environmental impacts (unless those impacts will lessen the impacts of the original permit).

    6358a. Major modification to a Class I injection facility.

    6367$1,000

    6369b. Major modification to a Class III injection facility.

    6378$500

    6379c. Major modification to a Class V injection facility.

    6388$250

    638916. Minor modifications are modifications to an injection facility that do not require a substantial technical evaluation by the Department, will not result in increased capacity of the injection system, do not require a new site inspection by the Department, and will not lead to substantially different environmental impacts or will lessen the impacts of the original permit.

    6447a. Minor modification to a Class I or Class III injection facility.

    6459$250

    6460b. Minor modification to a Class V injection facility.

    6469$100

    647017. Rerating of the permitted capacity of a Class I injection well to the maximum injection velocity allowed under paragraph 62-28.230(1)(e), F.A.C.

     

    6492$250

    6493(n) Drinking Water (Public Water Supply) Permits.

    65001. Construction permit for each Category I through III treatment plant, as defined in Rule 651562-699.310, 6516F.A.C.

    6517a. Treatment plant – 5 MGD and above

    6525$12,500

    6527b. Treatment plant – 1 MGD up to 5 MGD

    6537$10,000

    6539c. Treatment plant – 0.25 MGD up to 1 MGD

    6549$7,000

    6551d. Treatment plant – 0.1 MGD up to 0.25 MGD

    6561$4,000

    6563e. Treatment plant – up to 0.1 MGD

    6571$2,000

    65732. Construction permit for each Category IV treatment plant, as defined in Rule 658662-699.310, 6587F.A.C.

    6588a. Treatment plant – 5 MGD and above

    6596$12,500

    6598b. Treatment plant – 1 MGD up to 5 MGD

    6608$10,000

    6610c. Treatment plant – 0.25 MGD up to 1 MGD

    6620$7,000

    6622d. Treatment plant – 0.1 MGD up to 0.25 MGD

    6632$4,000

    6634e. Treatment plant – .01 MGD up to 0.1 MGD

    6644$2,000

    6646f. Treatment plant – up to 0.01 MGD

    6654$800

    66553. Construction permit for each Category V treatment plant, as defined in Rule 666862-699.310, 6669F.A.C.

    6670a. Treatment plant – 5 MGD and above

    6678$10,000

    6680b. Treatment plant – 1 MGD up to 5 MGD

    6690$6,000

    6692c. Treatment plant – 0.25 MGD up to 1 MGD

    6702$2,000

    6704d. Treatment plant – up to 0.25 MGD

    6712$1,000

    6714e. Treatment plant – up to 0.1 MGD

    6722$600

    67234. Distribution and transmission systems, including raw water lines into the plant, except those under general permit.

    6740a. Serving a community public water system

    6747$900

    6748b. Serving a non-transient non-community public water system

    6756$700

    6757c. Serving a non-community public water system

    6764$500

    67655. Construction permit for each public water supply well.

     

    6774a. Well located in a delineated area pursuant to Chapter 62-524, F.A.C.

    6786$1,000

    6788b. Any other public water supply well.

    6795$500

    67966. Major modifications to systems that alter the existing treatment without expanding the capacity of the system and are not considered substantial changes pursuant to subsection 682262-4.050(7), 6823F.A.C., below.

    6825a. 1 MGD and above

    6830$4,000

    6832b. 0.1 MGD up to 1 MGD

    6839$2,000

    6841c. 0.01 MGD up to 0.1 MGD

    6848$1,000

    6850d. Up to 0.01 MGD

    6855$500

    68567. Minor modifications to systems that result in no change in the treatment or capacity.

     

    6871a. 0.1 MGD and above

    6876$1,000

    6878b. Up to 0.1 MGD

    6883$500

    68848. General Permit fee for any General Permit not specifically in subparagraphs 1. through 7. above:

    6900a. General permits requiring Professional Engineer or Professional Geologist certification.

     

     

    6910$650

    6911b. General permits not requiring Professional Engineer or Professional Geologist certificaiton.

    6922$500

    6923(o) Temporary operation permits shall be 20 percent over the fee for the operation permit for the activity to be permitted.

    6944(p) General Permit fee for any General Permit not specifically listed in paragraphs (a) through (l).

    69601. General permits requiring Professional Engineer or Professional Geologist certification

    6970$250

    69712. General permits not requiring Professional Engineer or Professional Geologist certification.

    6982$100

    6983(q) Unless otherwise specified in this rule, the fee for applications for relief mechanisms shall be as follows:

     

    70011. Site specific alternative criteria for each application

    7009$15,000

    70112. Variance or exemption for each water quality criteria

    7020$6000

    70213. Variance or exemption for public water system from maximum contaminant level/treatment techniques

     

    7034$1000

    70354. Variance from other permitting standards or conditions

    7043$2000

    70445. Aquifer exemption – major

    7049$15,000

    70516. Aquifer exemption – minor

    7056$7500

    7057(r) Permits to construct or operate any other type of facility or stationary installation not specifically listed in paragraphs (a) through (n).

     

    7079$100

    7080(s) Minor modifications of permits that do not require substantial technical evaluation by the Department, do not require a new site inspection by the Department, and will not lead to substantially different environmental impacts or will lessen the impacts of the original permit:

    71231. To correct minor errors or typographical mistakes and that do not involve technical review

    7138$0

    71392. To incorporate changes requested by the Department or required through permits issued by other regulatory agencies, and to change due dates for reporting or performance deadlines when such changes in the due date do not involve any new work, any new work locations, or any new activities, and will not alter, replace, or otherwise eliminate the requirements for otherwise performing the work required by the permit

     

     

     

    7206$0

    72073. That consist of transfers of permits or time extensions

    7217$50

    72184. That consist of minor technical changes which involve new work, new work locations, new activities, or any other change which alters, replaces, or otherwise eliminates the work authorized by the permit when the original permit fee of the issued permit is less than $300, except for modifications to permits issued pursuant to Section 7272403.816, F.S.

     

     

    7274$50

    72755. That consist of minor technical changes which involve new work, new work locations, new activities, or any other change which alters, replaces, or otherwise eliminates the work authorized by the permit when the original permit fee of the issued permit is more than or equal to $300, except for Domestic Wastewater Facility Permits, Industrial Wastewater Facility Permits, Drinking Water (Public Water Supply) Permits, Underground Injection Control Permits and permits issued pursuant  to Section 7349403.816, F.S.

     

     

     

    7351$250

    7352(t) For purposes of requiring a permit application and fee for the following facility types, each non-contiguous project shall be considered a stationary installation and shall require a separate application and fee.

    73841. Domestic wastewater collection system.

    73892. Drinking water distribution system.

    7394(u) All fees shall be deposited in the Florida Permit Fee Trust Fund created pursuant to Section 7411403.087(5), F.S.

    7413(v) If the department requires by rule or permit condition that any specific permit be renewed more frequently than once every five years, the permit fee shall be prorated based upon the permit fee schedule in effect at the time of permit renewal. Upon issuance of such a permit, a prorated refund of the fee shall be returned to the applicant. This provision does not apply to permits issued for less than five years which could be extended to five years without the filing of an application for renewal. However, applications for permits to continue operation of a facility where an existing permit has or is about to expire in accordance with Section 7526403.087(1), F.S., 7528shall be accompanied by the appropriate processing fee.

    7536(w) This fee schedule does not apply to applications for certification pursuant to Sections 288.501-.518, F.S., Florida Industrial Siting Act; Sections 341.321-.386, F.S., the High Speed Rail Transportation Commission, except that fees may be assessed for the permitting of Ancillary Facilities under the Act for which a master plan approval was granted under the Act; to Sections 403.501-.519, F.S., Florida Electrical Power Plant Siting Act; or to Sections 403.52-.539, F.S., the Transmission Line Siting Act.

    7611(x) This fee schedule will supersede all other references to fees in Department rules or forms, where in conflict except as noted in paragraph 763562-4.050(4)(n), 7636F.A.C.

    7637(y) In the jurisdiction of an approved local program which in accordance with an interagency agreement assists the Department in the processing of permits the fee paid to the Department shall be reduced by the amount specified in the agreement. That amount shall be commensurate with the savings to the Department resulting from the assistance of the local program.

    7696(z) 7697The fees in paragraphs (e) through (i), and (n) shall be increased March 1, 2013, and at subsequent 5-year intervals, to adjust the fees for inflation using the percentage change in the 7729Consumer Price Index for the “CPI-U, U.S. City Average, All Items” established by the Bureau of Labor Statistics 7747(BLS) (7749www.bls.gov/cpi/7750), computed as provided in the BLS publication “Handbook of Methods,” Chapter 17 (7765www.bls.gov/opub/hom/pdf/homch17.pdf7766). The Department shall use the percentage change in the Consumer Price Index from March 2008 to December 2012 for the 2013 fee calculations and the 7792percentage change in the rates from March to December for subsequent five-year periods. The Department shall round any increased fees to the next highest whole ten dollar increment. In the event of deflation during the 5-year interval, the Department shall consult with the Executive Office of the Governor and the Legislature to determine whether downward fee adjustments are appropriate based on the current budget and appropriation considerations.

    7859(5)(a) To be considered by the Department, each application must be accompanied by the proper processing fee. The fee shall be paid by check, payable to the Department of Environmental Protection. The fee is non-refundable except as provided in Section 7899120.60, F.S., 7901and in this section.

    7905(b) When an application is received without the required fee, the Department shall acknowledge receipt of the application and shall immediately notify the applicant by certified mail that the required fee was not received and advise the applicant of the correct fee. The Department shall take no further action until the correct fee is received. If a fee was received by the Department which is less than the amount required, the Department shall return the fee along with the written notification.

    7986(c) Upon receipt of the proper application fee, the permit processing time requirements of Sections 8001120.60(1) 8002and 8003403.0876, F.S., 8005shall begin.

    8007(d) If the applicant does not submit the required fee within ten days of receipt of written notification, the Department shall either return the unprocessed application or arrange with the applicant for the pick up of the application.

    8045(e) If an applicant submits an application fee in excess of the required fee, the permit processing time requirements of Sections 8066120.60(1) 8067and 8068403.0876, F.S., 8070shall begin upon receipt, and the Department shall refund to the applicant the amount received in excess of the required fee.

    8091(6) Any substantial modification to a complete application shall require an additional processing fee determined pursuant to the schedule set forth in Rule 811462-4.050, 8115F.A.C., and shall restart the time requirements of Sections 8124120.60 8125and 8126403.0876, F.S. 8128For purposes of this subsection, the term “substantial modification” shall mean a modification which is reasonably expected to lead to substantially different environmental impacts which require a detailed review.

    8157(7) Modifications to existing permits proposed by the permittee which require substantial changes in the existing permit or require substantial evaluation by the Department of potential impacts of the proposed modifications shall require the same fee as a new application for the same time duration except for modification under Chapter 62-45, F.A.C.

    8209(8) The difference between the processing fee for applications for individual permits and the processing fee for general permits shall be refunded only for those applications that qualify for a general permit solely as a result of a change in Department rules while the application is being processed. Processing fees for applications for individual permits shall not be refunded in whole or in part where an applicant modifies a project to qualify for a general permit when the project did not qualify for a general permit when processing commenced.

    8298Rulemaking Authority 8300373.026, 8301373.043, 8302373.109, 8303373.4131, 8304373.414, 8305373.418, 8306373.421, 8307403.061, 8308403.087, 8309403.704(30), 8310403.805 FS. 8312Law Implemented 8314373.109, 8315373.309, 8316373.409, 8317373.413, 8318373.4135, 8319373.414(9), 8320(11), (12)(a), (13), (14), (15), (16), 8326373.4145, 8327373.418, 8328373.421, 8329403.061, 8330403.087, 8331403.0877, 8332403.088, 8333403.0885, 8334403.722, 8335403.861(7) FS. 8337History–New 5-17-72, Amended 6-19-74, 7-8-82, Formerly 17-4.05, Amended 118346-15-87, 8-31-88, 10-3-88, 4-4-89, 3-19-90, 6-11-90, 3-7-91, 3-18-91, 5-30-91, 10-30-91, 11-16-92, 12-21-92, 7-11-93, 2-2-94, Formerly 17-4.050, Amended 11-23-94, 4-30-95, 7-4-95, 12-15-98, 10-22-00, 6-1-01, 1-30-03, 2-19-03, 4-3-03, 5-1-03, 2-7-06, 10-31-07, 4-21-09, 5-9-13, 10-1-13, 2-17-16.

     