62-807.620. Replacements  


Effective on Tuesday, March 3, 2015
  • 1Emergency replacement of natural gas transmission pipelines certified under the Act will not be considered a modification pursuant to Section 21403.9418, F.S. 23A verbal report of the emergency must be made to the department as soon as possible. Within 30 days after correction of the emergency, a written report to the department and the PSC must be made outlining the details of the emergency and the steps taken for its relief. The written report must describe all of the work performed and must set forth any pollution control measures or mitigative measures which were utilized or are being utilized to prevent pollution of waters, harm to sensitive areas or alteration of archaeological or historical resources.

    116Rulemaking Authority 118403.9404(1) FS. 120Law Implemented 122403.9404(8), 123403.9418 FS. 125History–New 8-12-93, Formerly 17-807.620, Amended 3-3-15.

     

Rulemaking Events:

Historical Versions(1)

Select effective date to view different version.

Related Statutes: