The intent of this project is to widen and realign approximately six miles of State Road (S.R.) 388 from east of Burnt Mill Creek to S.R. 77. The existing two-lane roadway will be reconstructed as a four-lane divided roadway and will include a ...
OTHER AGENCIES AND ORGANIZATIONS
Carpe Diem Community Solutions, Inc.
The Florida Department of Transportation (FDOT) announces a hearing to which all persons are invited.
DATE AND TIME: Thursday, May 25, 2017: 5:30 p.m. – 6:00 p.m., CT, informal open house; 6:00 p.m. – 6:30 p.m. CT, formal presentation and public comments
PLACE: Gulf Coast State College Public Safety EOC Building, Room 176, 700 Highway 2300, Southport
GENERAL SUBJECT MATTER TO BE CONSIDERED: The intent of this project is to widen and realign approximately six miles of State Road (S.R.) 388 from east of Burnt Mill Creek to S.R. 77. The existing two-lane roadway will be reconstructed as a four-lane divided roadway and will include a twelve foot shared-use path along the south side of the roadway. The eastern 1.5 miles of the project will realign S.R. 388 northward to intersect with S.R. 77 at County Road 388 and a cul-de-sac will be constructed on existing S.R. 388 approximately 1 mile west of the existing S.R. 388 intersection at S.R. 77 and Edwards Road. Right-of-way and construction are not funded in the current FDOT Five-Year Work Program.
During the informal portion of the hearing, Florida Department of Transportation (FDOT) representatives will be available to discuss the project, answer questions, and receive your comments. A court reporter will also be available to receive your comments. During the formal portion of the hearing, FDOT will make a formal presentation which will be followed by public comments.
A copy of the agenda may be obtained by contacting: Jon McClain, P.E., FDOT Project Manager, (850)415-9020, jmcclain@hntb.com.
Pursuant to the provisions of the Americans with Disabilities Act, any person requiring special accommodations to participate in this workshop/meeting is asked to advise the agency at least 7 days before the workshop/meeting by contacting: Jon McClain, P.E., FDOT Project Manager, at the above phone number or email address. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).
For more information, you may contact: Ian Satter, District Three Public Information Director, toll-free at 1(888)638-0250, ext. 1205 or via email at ian.satter@dot.state.fl.us.
Document Information
- Hearing Meeting:
- Gulf Coast State College Public Safety EOC Building, Room 176, 700 Highway 2300, Southport.
- Subject:
- The intent of this project is to widen and realign approximately six miles of State Road (S.R.) 388 from east of Burnt Mill Creek to S.R. 77. The existing two-lane roadway will be reconstructed as a four-lane divided roadway and will include a twelve foot shared-use path along the south side of the roadway. The eastern 1.5 miles of the project will realign S.R. 388 northward to intersect with S.R. 77 at County Road 388 and a cul-de-sac will be constructed on existing S.R. 388 approximately 1 ...
- Meeting:
- hearing
- Contact:
- Jon McClain, P.E., FDOT Project Manager, at (850) 415-9020 or via email at jmcclain@hntb.com.